Concrete and masonry; Types of Construction

Concrete and masonry; Types of Construction

1st - 3rd Grade

30 Qs

quiz-placeholder

Similar activities

BT1 - QUIZ1

BT1 - QUIZ1

1st Grade

32 Qs

GROUP3 QUIZIZ (NEW)

GROUP3 QUIZIZ (NEW)

KG - Professional Development

25 Qs

Quiz

Quiz

KG - Professional Development

25 Qs

drawing

drawing

1st - 5th Grade

26 Qs

Sydney Trains!

Sydney Trains!

2nd Grade - Professional Development

28 Qs

MIDTERM EXAM CMT

MIDTERM EXAM CMT

2nd Grade

32 Qs

FINAL EXAM-CMT

FINAL EXAM-CMT

2nd Grade

30 Qs

PRO. PRAC.

PRO. PRAC.

1st Grade

30 Qs

Concrete and masonry; Types of Construction

Concrete and masonry; Types of Construction

Assessment

Quiz

Architecture

1st - 3rd Grade

Medium

Created by

Maria Go

Used 6+ times

FREE Resource

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

It is a continuous reinforcing bar having a seismic hook at one end and a hook not less than 90-degree hooks with at least six-diameter extension at the other end. The hooks shall engage peripheral longitudinal bars. the 90-degree hooks of two successive crossties engaging the same longitudinal bars shall be alternated end for end.

Reinforcing Steel Bars

Stirrups

Lateral Ties

Crosstie

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The normal weight of concrete is 2400kg/m3. This is equivalent to ____ in lb/ft3.

100

150

200

250

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A slight curve used in long spans such as beam, girder or truss with a purpose of counteracting deflection due to load.

Deflection

Elastic Curve

Camber

Arch

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The following are structures like a beam, except:

Girt

Joist

Purlin

Corbel

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A wall of treated timber, masonry, or concrete for holding in place a mass of earth.

Shear Wall

Bearing Wall

Retaining Wall

CHB Wall

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Planted Column is considered in design as:

Dead Load

Concentrated Load

Live Load

Uniformly Distributed Load

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which among the following activities takes 21 days before Formwork Removal is implemented?

Removal of soffit formwork to beams and slabs

Removal of props to beams spanning up to 6m

Removal of props to beams spanning over 6m

Removal of props to slabs spanning up to 4.5m

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?