Concrete and masonry; Types of Construction

Concrete and masonry; Types of Construction

1st - 3rd Grade

30 Qs

quiz-placeholder

Similar activities

merry oysters with Weston and Mikey

merry oysters with Weston and Mikey

1st Grade

26 Qs

learning Quiz

learning Quiz

2nd Grade

26 Qs

Quiz on Roman Architecture

Quiz on Roman Architecture

2nd Grade

30 Qs

Gr7 Quiz1 Revision 2sem

Gr7 Quiz1 Revision 2sem

1st Grade - University

30 Qs

fun pratice party

fun pratice party

2nd Grade

34 Qs

PRO. PRAC.

PRO. PRAC.

1st Grade

30 Qs

databrick_30

databrick_30

1st Grade - University

30 Qs

CKLA Unit 3 Human Body Review

CKLA Unit 3 Human Body Review

3rd Grade

26 Qs

Concrete and masonry; Types of Construction

Concrete and masonry; Types of Construction

Assessment

Quiz

Architecture

1st - 3rd Grade

Practice Problem

Medium

Created by

Maria Go

Used 6+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

It is a continuous reinforcing bar having a seismic hook at one end and a hook not less than 90-degree hooks with at least six-diameter extension at the other end. The hooks shall engage peripheral longitudinal bars. the 90-degree hooks of two successive crossties engaging the same longitudinal bars shall be alternated end for end.

Reinforcing Steel Bars

Stirrups

Lateral Ties

Crosstie

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The normal weight of concrete is 2400kg/m3. This is equivalent to ____ in lb/ft3.

100

150

200

250

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A slight curve used in long spans such as beam, girder or truss with a purpose of counteracting deflection due to load.

Deflection

Elastic Curve

Camber

Arch

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The following are structures like a beam, except:

Girt

Joist

Purlin

Corbel

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A wall of treated timber, masonry, or concrete for holding in place a mass of earth.

Shear Wall

Bearing Wall

Retaining Wall

CHB Wall

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Planted Column is considered in design as:

Dead Load

Concentrated Load

Live Load

Uniformly Distributed Load

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which among the following activities takes 21 days before Formwork Removal is implemented?

Removal of soffit formwork to beams and slabs

Removal of props to beams spanning up to 6m

Removal of props to beams spanning over 6m

Removal of props to slabs spanning up to 4.5m

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?