1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

After the installation and training completed, what is the next AV process?

Needs Analysis and Design

Service and Maintenance

Installation and Programming

Testing and Commissioning

2.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

When a new AV device fails within the first few weeks after installation, under which type of warranty is the repair typically addressed?

System warranty

Service agreement

Manufacturer’s warranty

Preventive warranty

3.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Which of the following types of maintenance agreements commits an AV company to providing ongoing preventive maintenance for a client system?

System warranty

Service agreement

Manufacturer’s warranty

Preventive warranty

4.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Which of the following is an example of preventive maintenance?

Replacing system cabling that is causing static within the system

Upgrading a display to a greater resolution to meet client needs

Replacing a projector bulb that is nearing the end of its operational life

Upgrading the programming on a control system to address newly installed components

5.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Which is NOT a task for a typical preventive maintenance?

Replace system components with unlimited service calls

Review system performance and identify problems

Test each system for proper operation

Make adjustment of equipment to optimize performance

6.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

What information should an AV technician prepare before proceeding to a customer site?

Information about the AV system  

Information about the HVAC system

Information about the company revenue

Information about the architectural drawing

7.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Which is NOT the relevant skills and knowledge required to accomplish the task of preventive maintenance?

Skill in maintaining audio visual systems

Knowledge of electronics testing procedure

Skill in maintaining electrical systems

Knowledge of safety procedure

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?