BUILDING TECHNOLOGY PT.2

BUILDING TECHNOLOGY PT.2

University

50 Qs

quiz-placeholder

Similar activities

ENTRY  LEVEL ASSESSMENT TEST FOR  B.Ed. STUDENTS

ENTRY LEVEL ASSESSMENT TEST FOR B.Ed. STUDENTS

University

50 Qs

UPNVJ EP - Kelas B - Kuis 2 Pengakun - TM 5-7

UPNVJ EP - Kelas B - Kuis 2 Pengakun - TM 5-7

University

50 Qs

Revision on Research Methodology

Revision on Research Methodology

University

50 Qs

Activity 1: Community Health Nursing Concepts

Activity 1: Community Health Nursing Concepts

University

50 Qs

Philippine Electrical Code (Subject 4) - Nth

Philippine Electrical Code (Subject 4) - Nth

University

50 Qs

Administrasi Pajak

Administrasi Pajak

10th Grade - University

45 Qs

Final Exam in Technical English

Final Exam in Technical English

University

50 Qs

AC Theory and 3 Phase Power

AC Theory and 3 Phase Power

University

50 Qs

BUILDING TECHNOLOGY PT.2

BUILDING TECHNOLOGY PT.2

Assessment

Quiz

Other

University

Medium

Created by

Aryelle Sison

Used 83+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

50 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Dry walls are customarily finished with

lath and plaster

mortar and hollow blocks

reinforced concrete

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The riser of a stair is 6 ½ inches. What is the run using formula R/T = tan (R-3) x 8 degrees

12.2247 inches

12.1000 inches

11.8975 inches

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

One method of leveling batterboards without the transit is the use of

¼ Ø plastic hose filled with water

eyesight

plumb bob

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

A manual method of squaring the corners of a building lines in building layout, is the use of

2-3-4 multiples with the use of transit

3-4-5 multiples with the use of steel tape measure

4-5-4 multiples and strings

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

When dry conditions are demanded of asphalt tile floor finishes on concrete over earth, apply the waterproofing (WP) steps

felt paper below sub-slab then WP on top of the sub-slab

felt paper below the top slab then WP the earth

WP the earth under slab

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Due to temperature effects in materials, concrete walls, slabs of long buildings, new buildings adjoining existing buildings should be provided with

flashing

welded joints

expansion joints

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

A typical block or panel type insulating material used in flat roof of commercial or industrial building

corkboard

acacia lumber

washed pebbles

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?