PRE-TEST TYPE B

PRE-TEST TYPE B

KG

15 Qs

quiz-placeholder

Similar activities

Group 4 Quiz

Group 4 Quiz

11th Grade - University

10 Qs

Working Principle of Lathe

Working Principle of Lathe

10th Grade - University

20 Qs

Machinist (Grinder) Level 1_121-135

Machinist (Grinder) Level 1_121-135

Professional Development

15 Qs

Ases-Frais

Ases-Frais

2nd Grade - University

10 Qs

PRE-TEST TYPE D

PRE-TEST TYPE D

KG

15 Qs

Tool & Die Maker (Dies & Moulds) Test 05

Tool & Die Maker (Dies & Moulds) Test 05

Professional Development

10 Qs

Manufacturing processes

Manufacturing processes

10th Grade

10 Qs

Tool & Die Maker (Dies & Moulds) 19

Tool & Die Maker (Dies & Moulds) 19

Professional Development

15 Qs

PRE-TEST TYPE B

PRE-TEST TYPE B

Assessment

Quiz

Instructional Technology, Special Education, Professional Development

KG

Medium

Created by

PRAKTIKUM MANUFAKTUR

Used 5+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

    The manufacturing process is to make a product with high value added that fill all the specification and all the functional aspect is the … of manufacturing processs

Function

Goal

Explanation

Description

2.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Processing operations apply heat, mechanical force, or a combination of these to effect a change in geometry of the work material is the meaning of…

    Shapping Process

Property - enhancing processes

  Surface processing operation

Processing operation

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one from the following statements about Manual Process Planning is incorrect? 

Deficiency productivity of process planner

Lack of legibility

High-cost task

Low-cost task

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

  Operation Process Chart (OPC) is diagram that illustrates the process step will be experienced by raw materials regarding the sequence of operations and checks from the start become a complete product or as a component, and contains information needed for further analysis continued is definition by….

(Sutalaksana, 2006)

     (Sutalaksana, 2016)

J T. Black (2015)

Scallan P (2003)

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Based on the picture, what is the name of the symbol in OPC ?

  Storage

   Transportation

Inspection

Operation

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many steps are there process planning?

10

  11

9

   12

7.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

The first step of process planning is …

Prepare the final process plan document. Make a routing sheet

Identify Datum Surface

  Study the overall shape of the part

Determine the best raw material shape to use

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?