CMA 385 - Estimating I Chapters 1-3

CMA 385 - Estimating I Chapters 1-3

University

84 Qs

quiz-placeholder

Similar activities

MET - CPL Mock Exam

MET - CPL Mock Exam

University

85 Qs

2ND avfun

2ND avfun

University

80 Qs

Descriptive vs Inferential Statistics Long Quiz

Descriptive vs Inferential Statistics Long Quiz

University

89 Qs

PROCUREMENT MANAGEMENT

PROCUREMENT MANAGEMENT

University

82 Qs

Private Pilot Training - Module 2

Private Pilot Training - Module 2

9th Grade - Professional Development

84 Qs

EXAM

EXAM

University

80 Qs

2020 Overview

2020 Overview

KG - Professional Development

81 Qs

TCEE_TKT

TCEE_TKT

University

80 Qs

CMA 385 - Estimating I Chapters 1-3

CMA 385 - Estimating I Chapters 1-3

Assessment

Quiz

Other

University

Medium

Created by

Jeremiah Arnett

Used 185+ times

FREE Resource

84 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 3 pts

___ estimates are prepared as the design process proceeds towards completion.

Rough

Interim

Preliminary

Simple

2.

MULTIPLE CHOICE QUESTION

30 sec • 3 pts

The levels of ___ estimates include detail takeoff and crew-based estimates.

final

closing

concluding

finished

3.

MULTIPLE CHOICE QUESTION

30 sec • 3 pts

The ___ used depend on company practice, the project being estimated, and/or estimator preference.

pricing parameters

costing calculations

financial prodedures

estimating practices

4.

MULTIPLE CHOICE QUESTION

30 sec • 3 pts

___ estimates are used to develop various basic project budgets based on a variety of project options and require the least amount of construction documentation to complete.

Coneptual

Order of magnitude

Detail takeoff

Construction document

5.

MULTIPLE CHOICE QUESTION

30 sec • 3 pts

___ estimates, also referred to as schematic or model estimates, are based on the building function or the functional area of the building.

Design development

Conceptual

Detail takeoff

Construction document

6.

MULTIPLE CHOICE QUESTION

30 sec • 3 pts

___ estimates require completion of the majority of the construction documents and confirm the overall project costs as the design nears completion.

Construction document

Detail takeoff

Order of magnitude

Design development

7.

MULTIPLE CHOICE QUESTION

30 sec • 3 pts

At the ___ estimate level, owners commonly compare the costs determined at this level of estimating with bids received from various contractors and subcontractors.

construction document

detail takeoff

design development

crew-based

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?