HAC101 Week 7 Quiz Evaporators

HAC101 Week 7 Quiz Evaporators

Professional Development

20 Qs

quiz-placeholder

Similar activities

HAC101 Week 9 Quiz Climate Control

HAC101 Week 9 Quiz Climate Control

Professional Development

24 Qs

Air Conditioning in Vehicles Quiz

Air Conditioning in Vehicles Quiz

Professional Development

22 Qs

 EPA 608 Core Recovery Equipment Quiz

EPA 608 Core Recovery Equipment Quiz

Professional Development

15 Qs

U5 Practice (Viewpoint 2)

U5 Practice (Viewpoint 2)

Professional Development

15 Qs

HAC101 Week 4 Quiz Condenser/Drier

HAC101 Week 4 Quiz Condenser/Drier

Professional Development

20 Qs

HAC101 Week 6 Quiz Expansion Valves

HAC101 Week 6 Quiz Expansion Valves

Professional Development

20 Qs

HAC101 Week 2 Quiz Heating & Ventilation

HAC101 Week 2 Quiz Heating & Ventilation

Professional Development

20 Qs

HAC101 Week 8 Quiz

HAC101 Week 8 Quiz

Professional Development

20 Qs

HAC101 Week 7 Quiz Evaporators

HAC101 Week 7 Quiz Evaporators

Assessment

Quiz

Professional Development

Professional Development

Medium

Created by

Mark Raybon

Used 38+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

After the refrigerant has been charged into the air-conditioning system, rotate the compressor shaft by hand to push out any _______ that may have entered the compressor during the charge process.

Select one:

Air bubbles

Dust

Debris

Liquid

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Tech A states that verifying the repair is performed by post-testing of the air-conditioning system. Tech B states that an electronic leak detector or fluorescent dye testing is used when the system is discharged. Who is correct?

Select one:

Tech A

Tech B

Both A and B

Neither A nor B

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Technicians must be ________ certified to handle refrigerants.

Select one:

ASE 607

ASE 515

EPA 609

EPA 511

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum amount of time an A/C system should be evacuated for to effectively boil all the water out of the A/C system?

Select one:

10 Minutes

15 Minutes

30 Minutes

45 Minutes

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

________ is the term used to describe the process of making the system perform to its maximum ability and comparing that to specifications.

Select one:

Air-conditioning testing

Performance testing

Evacuation of the system

Post-testing

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The first step in the diagnostic process of the HVAC system is _______.

Select one:

Diagnosing any faults that are causing the system to operate incorrectly

Evacuating the air-conditioning system

Reclaiming the air-conditioning system before any repair or nitrogen testing is required

Carrying out a performance test of the air-conditioning system

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

________ is the process of creating a low pressure or vacuum in the air-conditioning system, using a vacuum pump and gauges.

Select one:

Reclaiming

Evacuation

Charging

Recovering

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?