HAC101 Week 7 Quiz Evaporators

HAC101 Week 7 Quiz Evaporators

Professional Development

20 Qs

quiz-placeholder

Similar activities

HAC101 Week 9 Quiz Climate Control

HAC101 Week 9 Quiz Climate Control

Professional Development

24 Qs

HAC101 Week 8 Quiz

HAC101 Week 8 Quiz

Professional Development

20 Qs

HAC101 Week 4 Quiz Condenser/Drier

HAC101 Week 4 Quiz Condenser/Drier

Professional Development

20 Qs

HAC101 Week 6 Quiz Expansion Valves

HAC101 Week 6 Quiz Expansion Valves

Professional Development

20 Qs

HAC101 Week 2 Quiz Heating & Ventilation

HAC101 Week 2 Quiz Heating & Ventilation

Professional Development

20 Qs

Lets know about Air Conditioning & Refrigeration:

Lets know about Air Conditioning & Refrigeration:

Professional Development

20 Qs

Midterm Review

Midterm Review

Professional Development

25 Qs

Metering Devices

Metering Devices

Professional Development

20 Qs

HAC101 Week 7 Quiz Evaporators

HAC101 Week 7 Quiz Evaporators

Assessment

Quiz

Professional Development

Professional Development

Medium

Created by

Mark Raybon

Used 38+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

After the refrigerant has been charged into the air-conditioning system, rotate the compressor shaft by hand to push out any _______ that may have entered the compressor during the charge process.

Select one:

Air bubbles

Dust

Debris

Liquid

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Tech A states that verifying the repair is performed by post-testing of the air-conditioning system. Tech B states that an electronic leak detector or fluorescent dye testing is used when the system is discharged. Who is correct?

Select one:

Tech A

Tech B

Both A and B

Neither A nor B

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Technicians must be ________ certified to handle refrigerants.

Select one:

ASE 607

ASE 515

EPA 609

EPA 511

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum amount of time an A/C system should be evacuated for to effectively boil all the water out of the A/C system?

Select one:

10 Minutes

15 Minutes

30 Minutes

45 Minutes

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

________ is the term used to describe the process of making the system perform to its maximum ability and comparing that to specifications.

Select one:

Air-conditioning testing

Performance testing

Evacuation of the system

Post-testing

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The first step in the diagnostic process of the HVAC system is _______.

Select one:

Diagnosing any faults that are causing the system to operate incorrectly

Evacuating the air-conditioning system

Reclaiming the air-conditioning system before any repair or nitrogen testing is required

Carrying out a performance test of the air-conditioning system

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

________ is the process of creating a low pressure or vacuum in the air-conditioning system, using a vacuum pump and gauges.

Select one:

Reclaiming

Evacuation

Charging

Recovering

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?