Project Management for Systems Engineer

Project Management for Systems Engineer

University

10 Qs

quiz-placeholder

Similar activities

Quiz 8 Tata Kelola Teknologi Informasi 2020-1

Quiz 8 Tata Kelola Teknologi Informasi 2020-1

University

10 Qs

What is Instructional Design?

What is Instructional Design?

University

12 Qs

L1: New Document & Settings

L1: New Document & Settings

9th Grade - University

13 Qs

About Active Learning

About Active Learning

University - Professional Development

9 Qs

Semester-long Quiz

Semester-long Quiz

University

12 Qs

FULL KUIZ

FULL KUIZ

University

11 Qs

Vex VR Session 4

Vex VR Session 4

5th Grade - University

10 Qs

Metodología para el desarrollo de proyectos (2do.parcial)

Metodología para el desarrollo de proyectos (2do.parcial)

University

10 Qs

Project Management for Systems Engineer

Project Management for Systems Engineer

Assessment

Quiz

Instructional Technology

University

Medium

Created by

SATHIABAMA A

Used 3+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The third stage of the project life cycle is...

Closure and evaluation

Execution

Planning

Initiation

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Initiation is the stage where aims and objectives of the project are agreed. An aim is..

Overarching goal for the project

Detailed plans for the project

The identification of everything that is required to make a project work

The formal process of putting the project forward

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A feasibility study should be carried out ...

to agree the aims and objectives

to decide if the project should go ahead at all

to justify the need for the project

because management require it

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The planning stage of the project will NOT include which of the following elements

Feasibility study

Resources

Finance

Quality

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Control measures are ...

An analysis of the expected benefits of carrying out a project against the cost of running the project

Checking quality on an ongoing basis against targets or judging fitness of purpose using regular inspections

Measures used to check the quality, such as that raw materials are up to standard.

Steps taken to remove or reduce risks that would negatively affect the project

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The final stage of the project life cycle is..

Initiation

Planning

Execution

Evaluation

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A SWOT analysis identifies...

Something Which Otherwise Threatens

Strengths Weaknesses Opposition Threats

Strengths Weaknesses Opportunities Threats

Separations Weaknesses Oppositions Threats

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?