
AMS 109 B
Other
Professional Development
Used 1+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
25 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What does SPC stand for?
sampling plan control
statistical production control
statistical productive control
statistical process control
2.
MULTIPLE SELECT QUESTION
45 sec • 1 pt
Which of the following are benefits of control charts (select all that apply)?
ongoing control of process
help process to perform consistently and predictably
achieve higher quality, lower unit cost, higher effective capability
common language for discussing performance of process
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What type of action is usually required to reduce variation due to common causes?
actions on the system by management
local action by people close to the process
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What type of action is usually required to reduce variation due to special causes?
actions on the system by management
local action by people close to the process
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is not a stage in the Continual Process Improvement Cycle?
maintain
improve
analyze
detect
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is not a type of attribute data?
presence of required label
scratches
thickness
burrs
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is not a type of variable data?
tensile strength
burn marks
pH
length
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?