Search Header Logo

Central heating components parts 1-3

Authored by Luke Rock

Other

10th Grade

Used 23+ times

Central heating components parts 1-3
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

15 questions

Show all answers

1.

MULTIPLE SELECT QUESTION

20 sec • 1 pt

Open-vented systems contain a feed and expansion (F&E) cistern, which fulfils two important functions, what are they?

The means by which water enters the system for filling and top-up

Feed to hot water cylinder

Separates air from system water

It allows space for the system water to expand when it is heated.

2.

MULTIPLE SELECT QUESTION

20 sec • 1 pt

What are you not allowed to fit on either the open vent pipe or the feed and expansion pipe?

Service valve

Gate valve

Tank connector

Stop valve

3.

FILL IN THE BLANK QUESTION

30 sec • 1 pt

Media Image

Which FOV type is this?

BS____

4.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

How high should the open vent pipe be above the water level?

250mm

400mm

450mm

500mm

5.

FILL IN THE BLANK QUESTION

30 sec • 1 pt

What can occur if the pump speed is set too high?

_______ ____

6.

FILL IN THE BLANK QUESTION

30 sec • 1 pt

The preferred pump position for an open vented system is one which:

creates a ________ system pressure – a system with mostly ‘negative’ pressure gives the opportunity for micro-leaks to pull air into the system

7.

FILL IN THE BLANK QUESTION

30 sec • 1 pt

The point where the cold feed connects. This is known as the _______ point.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?