1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What is the rated capacity of Biomass equipment illustrated?

3.5MVA- Transformer

3.0MW Switch Gear

3.5MW Switch Gear

3.0MVA Transformer

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Turbine operating speed ?

3000 rpm

2000 VAC

2500 RPM

3000 HZ

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the Equipment rating of the ORC Turbo Generator?

5.5MW

5.96MW

5MW

5.5MVA

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where is the equipment labeled MSBA located?

Power House

Control Room

MCC Room

Electrical Room

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What equipment does the 100KVA UPS supports?

Transformer

ORC Lubrication Unit

Hydraulic Unit

Turbine

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where is RIO-1 located?

Maintenance Room

ORC Room

Pump Room

Electrical Room

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What equipment is pointed by the green arrow?

Low Voltage Breaker

Low Voltage Switchgear

Medium Voltage Breaker

Medium Voltage Switch Gear

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?