Yamazumi

Yamazumi

Professional Development

8 Qs

quiz-placeholder

Similar activities

Evaluación Inicial. Biology and Geology 3ºESO

Evaluación Inicial. Biology and Geology 3ºESO

Professional Development

10 Qs

Student Disengagement

Student Disengagement

Professional Development

9 Qs

Choose the best answer.

Choose the best answer.

Professional Development

10 Qs

SMM Unit 4

SMM Unit 4

Professional Development

8 Qs

PruBSN Aspirasi 101

PruBSN Aspirasi 101

Professional Development

10 Qs

Jeffy

Jeffy

KG - Professional Development

10 Qs

Parent Feedback Survey

Parent Feedback Survey

Professional Development

10 Qs

CH1_Introduction

CH1_Introduction

Professional Development

10 Qs

Yamazumi

Yamazumi

Assessment

Quiz

Education

Professional Development

Hard

Created by

Emlyn Evans

FREE Resource

8 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Yamazumi is also known as ....

Sea saw banance

Linear balancing

Line Balancing

Variation balance

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What best describes Yamazumi as a tool to be used for....

Increasing visualisation and waiting time.

Decreasing waiting time and visualisation.

Eliminating waiting time and takt time.

Eliminating waiting time and increasing visualisation

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What best describes a Yamazumi chart, a tool for........

detecting errors and identifies inefficiencies

detecting cycle time of operators and identified inefficienceies.

detecting when layouts need re-arranging

detects inefficiencies and eliminates takt time

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What would be the most likely ouctome of using the Yamazumi tool?

Cycle time would remain constant

Re-arranging of workstations and operations to improve efficiency.

Re-arranging the cycle time of a component.

Workstations and operations would be unchanged.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which type of time classification ideally referrs to a common pace of production operators whihc yields the greatest efficiency?

Takt time

Total time

Fastest time

Cycle time

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What would be the likely expected result of using a Yamazumi chart?

Reducing line output

Reducing line efficiency

Increasing floor space

Synchronised Produciton

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What would be the likely expected result of using a Yamazumi chart?

Increasing line output

Reducing line efficiency

Inefficient use of floor space

Increasing operational costs

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A Yamazumi Chart will identify what?

Bottlenecks

Bottletops

Milkrun

FIFO