ISTQB Foundation 2

ISTQB Foundation 2

Professional Development

40 Qs

quiz-placeholder

Similar activities

ISTQB Question Bank 141 to 180

ISTQB Question Bank 141 to 180

Professional Development

40 Qs

ISTQB Question Bank 621 to 660

ISTQB Question Bank 621 to 660

Professional Development

40 Qs

ISTQB Foundation 10

ISTQB Foundation 10

Professional Development

40 Qs

ISTQB Foundation 7

ISTQB Foundation 7

Professional Development

40 Qs

 ISTQB Question Bank 341 to 380

ISTQB Question Bank 341 to 380

Professional Development

40 Qs

ISTQB Question Bank 501 to 540

ISTQB Question Bank 501 to 540

Professional Development

40 Qs

ISTQB Question Bank 181 to 220

ISTQB Question Bank 181 to 220

Professional Development

40 Qs

ISTQB Question Bank 821 to 860

ISTQB Question Bank 821 to 860

Professional Development

40 Qs

ISTQB Foundation 2

ISTQB Foundation 2

Assessment

Quiz

Science

Professional Development

Easy

Created by

Hiếu Bồ

Used 24+ times

FREE Resource

40 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Which statement about testing is true?
Testing is started after the code is written so that we have a system with which to work.
Testing is started as early as possible in the life cycle.
Testing is most economically done at the end of the life cycle.
Testing can only be done by an independent test team.

2.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

The risk of an undetected defect …
… does not influence testing in any way.
… has influence on test comprehensiveness and intensity.
… has no influence on the specification of the test cases.
… has no influence on the prioritization of the tests.

3.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

During testing, …
… all parts of the system should be tested with the same intensity, because defects can be everywhere.
… the user interface should primarily be tested, because failures in it are most annoying for the customer.
… system parts where failures may cause great risks should be tested most intensively.
… data base access should be tested intensively, in order to prevent wrong data and inconsistencies an the database

4.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Accrording to ISTQB syllabus, A software error can be described as…
A mismatch between the program and its specification
A description of the relationship between two or more variables or set members in which the values of one does not influence the values of others.
The process in which developers determinate the root cause of a bug and identify possible fixes.
Any ill-advised, substandard, or temporary fix applied to an urgent problem in the ( often misguided) belief that doing so will keep a project moving forward.

5.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Deciding how much testing is enough should take account of followings except?
Project constrains
Level of Rick
Decision Table
Safety

6.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Which of following is Not “Test Analysis and design” activity in “Fundamental Test Process”?
Identify necessary test data to support the test conditions and test cases
Identifying and prioritizing test conditions based on analysis of test items, the specification, behavior and structure of the software
Creating bi-directional traceability between test basic and test case
Creating test suites from the test procedures for efficient test execution

7.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Which is not a goal of writing effective Problem/Bug report?
Explain how to reproduce the problem
Analyze the error so you can describe it in a minimum number of steps.
Write a report that is complete, easy to understand, and non-antagonistic
Illustrate how to fix the problem

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?