ISTQB Question Bank 541 to 580

ISTQB Question Bank 541 to 580

Professional Development

40 Qs

quiz-placeholder

Similar activities

ISTQB Question Bank 941 to 980

ISTQB Question Bank 941 to 980

Professional Development

40 Qs

ISTQB Question Bank 981 to 1020

ISTQB Question Bank 981 to 1020

Professional Development

40 Qs

Agile Tester Foundation Sample Exam 001

Agile Tester Foundation Sample Exam 001

Professional Development

40 Qs

Agile Tester Foundation Sample Exam 007

Agile Tester Foundation Sample Exam 007

Professional Development

40 Qs

Mesin - Turbin Gas

Mesin - Turbin Gas

Professional Development

40 Qs

ISTQB Foundation 3

ISTQB Foundation 3

Professional Development

40 Qs

ISTQB - Mobile Application Testing 03

ISTQB - Mobile Application Testing 03

Professional Development

40 Qs

PT2 Revision Science by Adon

PT2 Revision Science by Adon

7th Grade - Professional Development

40 Qs

ISTQB Question Bank 541 to 580

ISTQB Question Bank 541 to 580

Assessment

Quiz

Science

Professional Development

Easy

Created by

Hiếu Bồ

Used 10+ times

FREE Resource

40 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

A type of integration testing in which software elements, hardware elements,or both are combined all at once into a component or an overall system, rather than in stages.
System Testing
Big-Bang Testing
Integration Testing
Unit Testing

2.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

You are the test manager and you are about the start the system testing. The developer team says that due to change in requirements they will be able to deliver the system to you for testing 5 working days after the due date. You can not change the resources( work hours, test tools, etc.) What steps you will take to be able to finish the testing in time.
Tell to the development team to deliver the system in time so that testing activity will be finish in time.
Extend the testing plan, so that you can accommodate the slip going to occur
Rank the functionality as per risk and concentrate more on critical functionality testing
Add more resources so that the slippage should be avoided

3.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

There is one application, which runs on a single terminal. There is another application that works on multiple terminals. What are the test techniques you will use on the second application that you would not do on the first application?
Integrity, Response time
Concurrency test, Scalability
Update & Rollback, Response time
Concurrency test, Integrity

4.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Which technique can be used to achieve input and output coverage? It can be applied to human input, input via interfaces to a system, or interface parameters in integration testing.
Error Guessing
Boundary Value Analysis
Decision Table testing
Equivalence partitioning

5.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Which of the following assertions about code coverage are correct?
Statement coverage usually requires more test case suites
100 % statement coverage guarantees 100 % decision coverage
100 % decision coverage implies 100 % statement coverage
Decision tables cannot be used to list statement coverage values

6.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Which of the following statements is true about white-box testing?
It includes functional testing
It includes loop testing
It is usually done after black-box testing
It is usually done during the integration testing phase

7.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

“The tracing of requirements for a test level through the layers of a test documentation” done by
Horizontal tracebility
Depth tracebility
Vertical tracebility
Horizontal & Vertical tracebilities

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?