ISTQB Agile Tester Extension Exam Crash Course Part 2

ISTQB Agile Tester Extension Exam Crash Course Part 2

Professional Development

40 Qs

quiz-placeholder

Similar activities

Quality_control

Quality_control

Professional Development

36 Qs

AI | Product Centric Value Delivery - Knowledge Quiz

AI | Product Centric Value Delivery - Knowledge Quiz

Professional Development

40 Qs

ISTQB Question Bank 861 to 900

ISTQB Question Bank 861 to 900

Professional Development

40 Qs

ISTQB Question Bank 901 to 940

ISTQB Question Bank 901 to 940

Professional Development

40 Qs

ISTQB - Mobile Application Testing 05

ISTQB - Mobile Application Testing 05

Professional Development

40 Qs

ISTQB Foundation 3

ISTQB Foundation 3

Professional Development

40 Qs

Agile Tester Foundation Sample Exam 007

Agile Tester Foundation Sample Exam 007

Professional Development

40 Qs

ISTQB Question Bank 421 to 460

ISTQB Question Bank 421 to 460

Professional Development

40 Qs

ISTQB Agile Tester Extension Exam Crash Course Part 2

ISTQB Agile Tester Extension Exam Crash Course Part 2

Assessment

Quiz

Science

Professional Development

Easy

Created by

Hiếu Bồ

Used 10+ times

FREE Resource

40 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Out of the following which items should NOT be raised during a retrospective meeting?
There should be more emphasis on unit testing in the future, to improve overall quality.
The build process is manual and takes too long. Research and implementation of an automated build framework should be done.
Tester XYZ is struggling to find defects. Test design training is required for this resource.
Automated regression test suites are taking too long to run. A review of the tests, to eliminate redundant or unnecessary tests, is required.

Answer explanation

It is too late to suggest inadequacy of training related to a resource being the bottleneck.

2.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Which out of the following TWO are reasons why automation is essential to agile projects?

<p>

i. So that teams maintain or increase their velocity

ii. To prevent the test team from becoming bored with manual, repetitive tasks

iii. To retest all test cases from previous iterations

iv. To eliminate regression in the product due to high code churn

v. To ensure that code changes do not break the software build

i and iv
i and v
iii and iv
ii and v

Answer explanation

Media Image

3.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

What is the correct sequence of activities for the Continuous Integration process?

<p>

i. Compile

ii. Static code analysis

iii. Deploy

iv. Unit test

V. Integration test

vi. Report

i, ii, iii, iv, vi, v
ii, i, iv, iii, v, vi
ii, i, iv, v, iii, v
v, ii, iii, iv, vi, i

Answer explanation

Media Image

4.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Which out of the following TWO are the benefits of Continuous Integration?

<p>

1. It allows earlier detection and easier root cause analysis of integration problems and conflicting changes.

2. It gives the development team regular feedback on whether the code is working.

3. Eliminate the need for a System test after the new changes are introduced.

4. The code check-in process is fast with continuous integration.

1 and 4
1 and 2
2 and 4
1 and 3

Answer explanation

Media Image

5.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Which out of the following TWO are risks to the Continuous Integration process?

<p>

1. Continuous Integration increases the manual testing activities.

2. It increases the regression risk associated with developer code refactoring.

3. Continuous integration tools have to be introduced and maintained.

4. Test automation requires additional resources and can be complex to establish.

1 and 4
1 and 2
2 and 3
3 and 4

Answer explanation

Media Image

6.

MULTIPLE SELECT QUESTION

15 mins • 1 pt

The tester collaborates with the team on which of the two following activities during release planning?
Specify the definition of “done”.
Creating testing tasks for user stories.
Testing of user stories.
Test strategy for all test levels, addressing test scope and technical risks.

Answer explanation

Media Image

7.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Out of the following which TWO activities will the tester be involved in during iteration planning?

<p>

1. Discuss the Test approach and test plan with the Team.

2. Help break down user stories into smaller and more detailed tasks.

3. Estimate testing tasks generated by new features planned for this iteration.

4. Support the clarification of the user stories and ensure that they are testable.

1 and 4
2 and 3
2 and 4
1 and 3

Answer explanation

Media Image

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?