
ISTQB Question Bank 661 to 700
Authored by Hiếu Bồ
Science
Professional Development
Used 10+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
40 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
Which of the following faults can be found by a static analysis tool?
<br>
I. Incorrect branch conditions logic.
II. Variables which are used after being defined.
III. Variables which are defined but never used.
IV. Standards violations
V. Illegal calls to routines
III, IV and V
II only
I, II, III and IV
II, III, IV and V
2.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
Which of the following characteristics and types of review processes belong together?
<br>
1. Led by the author
2. Undocumented
3. No management participation
4. Led by a trained moderator or leader
5. Uses entry and exit criteria
<br>
s. Inspection
t. Technical review
u. Informal review
v. Walkthrough
s = 4, t = 3, u = 2 and 5, v = 1
s = 4 and 5, t = 3, u = 2, v = 1
s = 1 and 5, t = 3, u = 2, v = 4
s = 5, t = 4, u = 3, v = 1 and 2
3.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
What statement about static analysis is true?
4.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
Which of the following statements about early test design are true and which are false?
<br>
1. Defects found during early test design are more expensive to fix.
2. Early test design can find defects.
3. Early test design can cause changes to the requirements.
4. Early test design takes more effort.
1 and 3 are true. 2 and 4 are false.
2 is true. 1, 3 and 4 are false.
2 and 3 are true. 1 and 4 are false.
2, 3 and 4 are true. 1 is false.
5.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
Static code analysis typically identifies all but one of the following problems. Which is it?
6.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
In which document described in IEEE 829 would you find instructions for the steps to be taken for a test including set-up, logging, environment and measurement?
7.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
With a highly experienced tester with a good business background, which approach to defining test procedures would be effective and most efficient for a project under severe time pressure?
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?