ISTQB Question Bank 661 to 700

ISTQB Question Bank 661 to 700

Professional Development

40 Qs

quiz-placeholder

Similar activities

ISTQB Question Bank 861 to 900

ISTQB Question Bank 861 to 900

Professional Development

40 Qs

ISTQB Foundation 10

ISTQB Foundation 10

Professional Development

40 Qs

Process Midterm

Process Midterm

Professional Development

35 Qs

ISTQB Question Bank 501 to 540

ISTQB Question Bank 501 to 540

Professional Development

40 Qs

ISTQB Question Bank 461 to 500

ISTQB Question Bank 461 to 500

Professional Development

40 Qs

ISTQB FOUNDATION 1

ISTQB FOUNDATION 1

Professional Development

40 Qs

ISTQB Question Bank 1021 to 1060

ISTQB Question Bank 1021 to 1060

Professional Development

40 Qs

Stones previous

Stones previous

Professional Development

44 Qs

ISTQB Question Bank 661 to 700

ISTQB Question Bank 661 to 700

Assessment

Quiz

Science

Professional Development

Easy

Created by

Hiếu Bồ

Used 10+ times

FREE Resource

40 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Which of the following faults can be found by a static analysis tool?

<br>

I. Incorrect branch conditions logic.

II. Variables which are used after being defined.

III. Variables which are defined but never used.

IV. Standards violations

V. Illegal calls to routines

III, IV and V

II only

I, II, III and IV

II, III, IV and V

2.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Which of the following characteristics and types of review processes belong together?

<br>

1. Led by the author

2. Undocumented

3. No management participation

4. Led by a trained moderator or leader

5. Uses entry and exit criteria

<br>

s. Inspection

t. Technical review

u. Informal review

v. Walkthrough

s = 4, t = 3, u = 2 and 5, v = 1

s = 4 and 5, t = 3, u = 2, v = 1

s = 1 and 5, t = 3, u = 2, v = 4

s = 5, t = 4, u = 3, v = 1 and 2

3.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

What statement about static analysis is true?
With static analysis, defects can be found that are difficult to find with dynamic testing.
Compiling is not a form of static analysis.
When properly performed, static analysis makes functional testing redundant.
Static analysis finds all faults.

4.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Which of the following statements about early test design are true and which are false?

<br>

1. Defects found during early test design are more expensive to fix.

2. Early test design can find defects.

3. Early test design can cause changes to the requirements.

4. Early test design takes more effort.

1 and 3 are true. 2 and 4 are false.

2 is true. 1, 3 and 4 are false.

2 and 3 are true. 1 and 4 are false.

2, 3 and 4 are true. 1 is false.

5.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Static code analysis typically identifies all but one of the following problems. Which is it?
Unreachable code
Undeclared variables
Faults in the requirements
Too few comments

6.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

In which document described in IEEE 829 would you find instructions for the steps to be taken for a test including set-up, logging, environment and measurement?
Test plan
Test design specification
Test case specification
Test procedure specification

7.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

With a highly experienced tester with a good business background, which approach to defining test procedures would be effective and most efficient for a project under severe time pressure?
A high-level outline of the test conditions and general steps to take.
Every step in the test spelled out in detail.
A high-level outline of the test conditions with the steps to take discussed in detail with another experienced tester.
Detailed documentation of all test cases and careful records of each step taken in the testing.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?