1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Refer to the exhibit.
A project is on schedule and just beginning in the design development phase. The architect is developing the workplan for February and March of Year 2.
Which one of the following activities should the architect include in the workplan?
Development of the outline specification based on the design and project requirements.
Definition of the cost of work through a guaranteed maximum price in preparation of issuing the project to bid.
Coordination of design narratives between the architect and consultants to define basic project characteristics.
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
An architect is working on a large office building of Type V construction. A week before the 100% schematic design (SD) deliverable is due to the client, the architect conducts an internal review of the documents to confirm that the deliverable aligns with SD standards.
Which of the following review items should be included in the SD quality review checklist?
Complete procurement documents associated with allowances and unit prices.
Review private office count and square footage needs with current architectural plan.
Confirm structural engineer's documentation of final details to relocate existing columns.
Coordinate plumbing engineer's details with civil engineer's plan for fire protection service.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
During an architect's quality control review, the architect discovers the following code provisions for the minimum dimensions for all handrail extensions beyond the top riser of an egress stair:
-The state building code stipulates a minimum dimension that is two inches less than that required by the International Building Code.
-The local AHJ code stipulates a minimum dimension that is four inches greater than that required by the International Building Code.
Which code requirement must the architect follow for handrail extensions in the construction documents?
International Building Code
State building code
Local AHJ code
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
During the design of a restaurant, a local Design Review Board (DRB) must approve the building elevations before the AHJ can issue a permit, which the owner wants to obtain as soon as possible. The DRB reviews the rendered elevations and rejects the branded signage shown on the restaurant as inappropriate for the neighborhood. The signage is not part of the architect's scope of design work.
How should the architect proceed?
Submit the drawings to the AHJ without DRB approval.
Submit the drawings to the AHJ and apply for a variance from the DRB review requirement.
Remove the signage from the permit drawings to get DRB approval and submit the signage under a separate sign permit.
Provide elevations without signage for DRB review and issue a separate construction set to the contractor that includes the signage.
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
An architect completes the design development phase for a new apartment complex. The client approves the design pending minor changes to the three-bedroom unit. During the meeting with the architect, the client requests that a pool be added to the project scope.
How should the architect reduce risks associated with this request?
Call the client to confirm the changes and determine the amount of additional services to include the pool.
Update the consultant's action items list with tasks related to the three-bedroom unit and pool design.
Send the client meeting minutes via e-mail for approval noting the discussed pool addition to the project.
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Refer to the exhibit.
A developer hires an architect for a project that includes additional cost estimating beyond the basic scope of design services. The architect must provide a cost estimate at the end of each design phase for cost control measures.
Which estimating technique is most appropriate at the end of April, Year 2?
Order of magnitude
Unit price
Assemblies
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?
Similar Resources on Wayground
10 questions
New Direction and Post Modernism Architecture
Quiz
•
University
10 questions
Theory of Architecture (Part 3)
Quiz
•
University - Professi...
9 questions
Theory of Architecture
Quiz
•
University
10 questions
Graphics 1 quiz 2
Quiz
•
University
10 questions
Refresher #1
Quiz
•
University
11 questions
Early Humans
Quiz
•
4th Grade - University
10 questions
Speed Limits in America
Quiz
•
5th Grade - Professio...
10 questions
P 203 WEEK 1_INTRO TO LAND USE PLANNING
Quiz
•
University
Popular Resources on Wayground
15 questions
Fractions on a Number Line
Quiz
•
3rd Grade
20 questions
Equivalent Fractions
Quiz
•
3rd Grade
25 questions
Multiplication Facts
Quiz
•
5th Grade
54 questions
Analyzing Line Graphs & Tables
Quiz
•
4th Grade
22 questions
fractions
Quiz
•
3rd Grade
20 questions
Main Idea and Details
Quiz
•
5th Grade
20 questions
Context Clues
Quiz
•
6th Grade
15 questions
Equivalent Fractions
Quiz
•
4th Grade
Discover more resources for Architecture
7 questions
How James Brown Invented Funk
Interactive video
•
10th Grade - University
5 questions
Helping Build the Internet: Valerie Thomas | Great Minds
Interactive video
•
11th Grade - University
12 questions
IREAD Week 4 - Review
Quiz
•
3rd Grade - University
23 questions
Subject Verb Agreement
Quiz
•
9th Grade - University
7 questions
Renewable and Nonrenewable Resources
Interactive video
•
4th Grade - University
19 questions
Review2-TEACHER
Quiz
•
University
15 questions
Pre2_STUDENT
Quiz
•
University
20 questions
Ch. 7 Quadrilateral Quiz Review
Quiz
•
KG - University