
AudCis 2023 SQ - 2023-03-18
Authored by Leyson Juan
Other
12th Grade
Used 7+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
11 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
1 min • 3 pts
The application control highlighted in the Red Box is called Source Document Control. It requires users to select a pre-existing system document (e.g. purchase order / scheduling agreement) as basis or reference before creating an Incoming Invoice. Which audit assertion below does this type of control support?
Validity
Authenticity
Completeness
Accuracy
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The application control highlighted in the Red Box is called Recalculate Control Total. It prompts an error and does not allow the user to proceed with the transaction if the Total Amount does not match with the sum of the individual amounts. Which assertion does this application control support?
Validity
Completeness
Accuracy
Authenticity
3.
MULTIPLE CHOICE QUESTION
1 min • 3 pts
The application control highlighted in the Red Box is called Automatic Prenumbering. The system automatically creates the series number of the new document created. This application control is essential for the following except:
Ensuring that documents are complete
Avoiding unintentional skips in the sequence
Ensuring the transaction amounts are accurate
Selecting samples in a systematic random sampling
4.
MULTIPLE CHOICE QUESTION
1 min • 3 pts
The application control highlighted in the Red Oval is called Park and Post. The following statements are correct in relation to the use of Park and Post except:
Park and Post Controls are affected by Change Control Management
Park and Post Controls are affected by Access Management
Park and Post Controls are key controls to ensure the validity of transactions
Park and Post Controls are controls to ensure proper cut-off in recognition of revenues and expenses
5.
MULTIPLE CHOICE QUESTION
30 sec • 3 pts
The application control that generates the error message displayed in the photo is called Check Digit. This control is essential to support that the transaction is:
Valid
Complete
Accurate
Reflects proper rights and obligations
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The application control shown in the photo is called a Dropdown Button. Under which category does this specific control fall?
Processing Controls
Input Controls
Output Controls
IT General Controls
7.
MULTIPLE CHOICE QUESTION
1 min • 3 pts
The highlighted digits signify the existence of a processing control. This control aims detect whether any changes have been made to the original data set or file. By performing certain calculations and comparing it to the highlighted digits, the system can determine whether any changes have been made. If the system calculation and the highlighted digits are same, it indicates that the data has not been modified during transit or storage. If they differ, it suggests that the data has been altered, either intentionally or accidentally. This control is called:
Check digit
Hash total
Data matching
Structured Query Language
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?