PEC 3

PEC 3

University

50 Qs

quiz-placeholder

Similar activities

GEAS 32

GEAS 32

University

50 Qs

GEAS 2

GEAS 2

University

50 Qs

CAMII DAY 14: MARENV/GARBAGE MANAGEMENT PLAN

CAMII DAY 14: MARENV/GARBAGE MANAGEMENT PLAN

University

48 Qs

GEAS 30

GEAS 30

University

50 Qs

IT Fundamentals Test Part 1

IT Fundamentals Test Part 1

KG - University

49 Qs

OPENBOOK EXAM #7

OPENBOOK EXAM #7

University

49 Qs

PART 8: MCQ from Number 351 – 400

PART 8: MCQ from Number 351 – 400

University

50 Qs

Structural NSCP Standards

Structural NSCP Standards

University

50 Qs

PEC 3

PEC 3

Assessment

Quiz

Other

University

Hard

Created by

Lira Ortega

FREE Resource

50 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

An assembly drawing for a switchboard appears to have some errors. As supervisor, what steps will your take?

report the apparent error to your supervisor.

make the connection per drawing but be prepared to correct it if orders.

hold the job until you have checked with the person who installed the plans.

proceeds making the corrections on the drawing.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Branch circuit conductors supplying a single-phase motor shall have an ampacity NOT exceeding

100%

125%

200%

115%

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Flat conductor cables maybe installed in any of the following locations Except one. Which one of this?

in wet locations

in damp locations

on hard concrete flooring

for branch circuits

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For the installations of 2.0 mm² conductors in 600-volts circuits. What is the minimum insulation resistance allowed by the Philippine Electrical code?

500,000 ohms

1,000,000 ohms

750,000 ohms

250,000 ohms

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The following are types of protection for single pase induction motors, EXCEPT

overload protection

ground fault protection

under voltage protection

single phase protection

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The Philippine Electrical Code, Part 1 does not cover wiring of equipment installed within or to or from one of the following. Which is one is this?

trailers

Mobile Homes

water crafts

airplanes

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Vertical clearances of all service drop conductors above roofs shall NOT be less than one of the following values.

2,000 mm

2,750 mm

3,000 mm

2,500 mm

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?