Phase 2 Exam prep 2

Phase 2 Exam prep 2

Professional Development

20 Qs

quiz-placeholder

Similar activities

AUT105 Week 2 Hydraulics & Power Brake Theory Chapter 44 Test

AUT105 Week 2 Hydraulics & Power Brake Theory Chapter 44 Test

Professional Development

20 Qs

Unit 33 quiz

Unit 33 quiz

Professional Development

19 Qs

L3 AP Cold water P2

L3 AP Cold water P2

University - Professional Development

17 Qs

BMC Mechanic Patria (SST Product)

BMC Mechanic Patria (SST Product)

Professional Development

20 Qs

Central Heating revision | 6035

Central Heating revision | 6035

Professional Development

22 Qs

Remove and Install Travel Motor PC2000

Remove and Install Travel Motor PC2000

KG - Professional Development

20 Qs

Cooling systems

Cooling systems

Professional Development

20 Qs

Rice TransPlanter POST-TEST

Rice TransPlanter POST-TEST

Professional Development

20 Qs

Phase 2 Exam prep 2

Phase 2 Exam prep 2

Assessment

Quiz

Professional Development

Professional Development

Medium

Created by

Anthony Price

Used 22+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

45 sec • 5 pts

A discharge branch 6 m in length has a recommended fall of 18 mm/m, What should the vertical drop be at the end of the pipe run?

180 mm

110 mm

418 mm

108 mm

2.

MULTIPLE CHOICE QUESTION

45 sec • 5 pts

Media Image

What type of drainage system is shown in the diagram?

A combined system

A partially separate system

A separate system

A partially separate system

3.

MULTIPLE CHOICE QUESTION

45 sec • 5 pts

What is another term for the offset from the gutter to the downpipe?

Direco-change

Cranked turn

Goose neck

Swan neck

4.

MULTIPLE CHOICE QUESTION

45 sec • 5 pts

What is the recommended ratio of fall for guttering systems?

1:400

1:60

1:600

1:2000

5.

MULTIPLE CHOICE QUESTION

45 sec • 5 pts

Which of the following is a downpipe fitting?

Slipper

Boot

Shoe

Belt

6.

MULTIPLE CHOICE QUESTION

45 sec • 5 pts

An RPZ valve should be installed with:

An isolating valve upstream of the RPZ valve

An isolating valve downstream of the RPZ valve

An isolating valve both upstream and downstream of the RPZ valve

No isolating valves

7.

MULTIPLE CHOICE QUESTION

45 sec • 5 pts

Which one of the following types of air gap provides suitable backflow protection for the taps in a washbasin installed in a hospital?

AB air gap

AUK 1 air gap

AUK 2 air gap

AUK 3 air gap

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?