Waste

Waste

12th Grade

20 Qs

quiz-placeholder

Similar activities

Shuttleworth Welcome Day Quiz (Level 3)

Shuttleworth Welcome Day Quiz (Level 3)

11th - 12th Grade

15 Qs

Economics Total Recall (Personal Finance)

Economics Total Recall (Personal Finance)

9th - 12th Grade

17 Qs

Unit 1: Research Methods Psychology

Unit 1: Research Methods Psychology

11th - 12th Grade

20 Qs

College 101

College 101

9th - 12th Grade

20 Qs

Big Cats

Big Cats

3rd - 12th Grade

18 Qs

B5L4 Lab-Grown Meat Quiz

B5L4 Lab-Grown Meat Quiz

12th Grade

20 Qs

Burger

Burger

1st - 12th Grade

15 Qs

4.2.1-3 Conflicts Revision

4.2.1-3 Conflicts Revision

12th Grade

15 Qs

Waste

Waste

Assessment

Quiz

Other

12th Grade

Practice Problem

Hard

Created by

CYNTHIA TURNER

Used 7+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are the 3 main types of waste?

Agricultural waste,

Animal by-products, and Biodegradable waste.

Domestic, Business waste, and Clinical waste.

Industrial, Commercial, and Agricultural.

Industrial, Chemical waste, and

Clinical waste.

2.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

What is waste?

Everything that no longer has a use or purpose and needs to be disposed of

trash

Something you dont want

are unwanted or unusable materials

3.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

What is the TWO (2) ways to minimize /eliminate inventory waste?

To have proper planning to keep raw material and finished goods inventories as lean as possible

Clarify customers' standards and expectations ahead of time

Remove excessive or unnecessary machine movements/actions

Use Just-In-Time (JIT) inventory techniques

4.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

What are the TWO (2) countermeasure for Transportation waste?

Using a ‘Takt Time’ ensures that the rate of manufacturing between stations are even

Purchasing raw materials only when needed and in the quantity needed

Creating flow between processes

Developing a U-shape production line

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many different types waste is in Lean Manufacturing?

4

8

10

5

6.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Media Image

What is/are the action(s) that lead(s) to pollution?

Littering

Open burning

Dumping waste in waters

All of the above

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Reducing your carbon footprint contributes to a more sustainable future. What does it mean by 'carbon footprint'?

Your shoe size

Amount of carbon dioxide (CO2 ) & greenhouse gases produced by your actions

Amount of oxygen (O2) & water (H2O) used by your actions

Your parents' shoe size

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?