PM 1

PM 1

University

5 Qs

quiz-placeholder

Similar activities

Introducción al diseño de plantas mineras

Introducción al diseño de plantas mineras

University

10 Qs

Health Assessment

Health Assessment

University

10 Qs

NCM 110 - CARE DELIVERY ACROSS THE CARE CONTINUUM

NCM 110 - CARE DELIVERY ACROSS THE CARE CONTINUUM

University

10 Qs

Introduction to Health Assessment

Introduction to Health Assessment

University

7 Qs

กิจกรรม2 ช่องว่างของกฏหมาย

กิจกรรม2 ช่องว่างของกฏหมาย

University

1 Qs

Assistive Technologies

Assistive Technologies

University

10 Qs

CanU Aspire week 1

CanU Aspire week 1

University

10 Qs

EIA- intro

EIA- intro

University

5 Qs

PM 1

PM 1

Assessment

Quiz

Science

University

Medium

NGSS
MS-ETS1-1, MS-ESS3-2, HS-ETS1-3

+1

Standards-aligned

Created by

MAKHLUK TUHAN

Used 4+ times

FREE Resource

5 questions

Show all answers

1.

DRAG AND DROP QUESTION

1 min • 2 pts

Below are 4 of the 6 key elements in construction project EXCEPT (a)  

SAFETY
SCHEDULE
COMMUNICATION
JAMUAN RAYA

Answer explanation

`

2.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

What are one of the main things that need to be managed and controlled in

construction projects?

Plastic Surgery's Cost

Ketupat and Lemang

Safety and Health of Workers

K-dramas

Tags

NGSS.MS-ETS1-1

NGSS.MS-ETS1-2

3.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

What is an "S-Curve" graph?

A mathematical graph that depicts relevant cumulative data for a project — such as cost or man-hours — plotted against time

A mathematical graph that depicts relevant cumulative data for an ideal body weight(kg) against rendang(kg) consumption

A mathematical graph that depicts relevant cumulative data for time available to play mobile legend(hr) against number of pending assignments(no.)

A mathematical graph that depicts relevant cumulative data for available time left before you die

4.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

What is HIRAC?

Hari Raya Cun (HIRAC)

Himalaya's Raspberries And Cherries (HIRAC)

Hazard Identification, Risk Assessment, and Control (HIRAC)

Hamparan Ini Rasa Amat Ceronok (HIRAC)

Tags

NGSS.MS-ESS3-2

5.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

What are the example of TWO assessments needed for construction projects?

Environmental

Impala Assessment (EIA) and Traffic Impala Assessment (TIA)

Environmental

Impact Assessment (EIA) and Traffic Impact Assessment (TIA)

Engineering

Impact Assessment (EIA) and Technology Impact Assessment (TIA)

Eun Woo Impact Assessment (EIA) and Tae Yang Impact Assessment (TIA)