1.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

While implementing the project, there are changes on mounting relocation and added cable path. Which one of the following drawings captures those changes?

As built drawing

Floor plan

Riser drawing

Elevation drawing

2.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Which one of the following drawings illustrates the mounting heights of wall devices?

As built drawing

Floor plan

Riser drawing

Elevation drawing

3.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Which one of the following drawings demonstrates the devices , components and their interconnection cables?

As built drawing

Floor plan

Riser drawing

Elevation drawing

4.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Which one of the following drawings shows top down view of an area where security devices and systems are located?

As built drawing

Floor plan

Riser drawing

Elevation drawing

5.

FILL IN THE BLANK QUESTION

30 sec • 1 pt

The table list showing related security devices is called _____________________ .

6.

OPEN ENDED QUESTION

1 min • 1 pt

Draft TWO checks to be added to Testing and Commissioning (T&C) of the door hardware.

Evaluate responses using AI:

OFF

7.

OPEN ENDED QUESTION

1 min • 1 pt

Draft TWO checks to be added to Testing and Commissioning (T&C) of the reader.

Evaluate responses using AI:

OFF

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?