Feedback & Modify

Feedback & Modify

12th Grade

7 Qs

quiz-placeholder

Similar activities

DHS Y13 TD Quiz 2 - Dihedral Angles

DHS Y13 TD Quiz 2 - Dihedral Angles

12th Grade

6 Qs

Publishing Digital Media in Photoshop 2B

Publishing Digital Media in Photoshop 2B

12th Grade

10 Qs

Autodesk Inventor Constraint Review

Autodesk Inventor Constraint Review

6th - 12th Grade

6 Qs

Design Studio 4 Final Exam Level 1 - 10 items for 20 pts.

Design Studio 4 Final Exam Level 1 - 10 items for 20 pts.

12th Grade

10 Qs

Lecture 5,6,7 Quiz

Lecture 5,6,7 Quiz

12th Grade

10 Qs

KOMPETENSI KEAHLIAN MULTIMEDIA 1

KOMPETENSI KEAHLIAN MULTIMEDIA 1

KG - University

10 Qs

Creative Brief

Creative Brief

10th - 12th Grade

9 Qs

Design Process Concepts Quiz

Design Process Concepts Quiz

6th - 12th Grade

10 Qs

Feedback & Modify

Feedback & Modify

Assessment

Quiz

Design

12th Grade

Easy

Created by

Alex Bevin

Used 2+ times

FREE Resource

7 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image
What is the primary purpose of creating an end-user profile in the design process?
To impress the teacher
To better understand the stakeholder's needs and preferences
To make the project look more professional
To add unnecessary complexity to the project

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of these is NOT a joinery technique?
Biscuit
Wood Brace
Metal Bracket
Glue Stick

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is an important factor to consider when selecting materials for a project?
Color of the material
Durability
How popular the material is
How shiny the material is

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which stakeholder type is NOT typically involved in the design process?
End user
Wider end users
Expert
Neighbors

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of these is a possible benefit of using pine plywood for a project?
It is extremely expensive
It is heavy and hard to work with
It has a relatively low cost
It is less sustainable than other materials

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary purpose of gathering stakeholder feedback?
To make the project more difficult
To validate your own opinions
To make informed decisions and improve the design
To increase the time spent on the project

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When comparing materials, why is sustainability important?
It is not important
It makes the project more expensive
It ensures the material is difficult to work with
It reduces the environmental impact of the project