GMJ 6035 central heating 5

GMJ 6035 central heating 5

Professional Development

15 Qs

quiz-placeholder

Similar activities

ระบบ  Thermostatic Steam Trap(Steam Distribution System)

ระบบ Thermostatic Steam Trap(Steam Distribution System)

Professional Development

20 Qs

Level 2 Cooling Systems

Level 2 Cooling Systems

Professional Development

10 Qs

Health & Safety Essentials

Health & Safety Essentials

Professional Development

10 Qs

Central heating trail 5

Central heating trail 5

Professional Development

11 Qs

GMJ 6035 central heating 4

GMJ 6035 central heating 4

Professional Development

20 Qs

Vehicle Air-Conditioning - Quiz

Vehicle Air-Conditioning - Quiz

Professional Development

10 Qs

LATIHAN 7 - OTBC 2023 "ENGINE CUT WAY"

LATIHAN 7 - OTBC 2023 "ENGINE CUT WAY"

Professional Development

20 Qs

Instrumen Panel HINO 500

Instrumen Panel HINO 500

Professional Development

19 Qs

GMJ 6035 central heating 5

GMJ 6035 central heating 5

Assessment

Quiz

Other

Professional Development

Medium

Created by

Glen Johnson

Used 120+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When it comes to humidity, which of the following would be ideal in a home environment?

10 to 20 per cent

20 to 40 per cent

40 to 60 per cent

50 to 70 per cent

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When designing a domestic central heating system, which of the following is the most important?

Clothing worn by occupants

Age and health of occupants

Finances of occupants

Occupation of occupants

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is incorrect?

C-Plan semi-gravity system

One-pipe semi-gravity system

Two-pipe semi-gravity system

One-pipe semi-gravity system with heat sink for solid fuel boilers

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Fully pumped heating systems offer wider installation options for which of the following:

The boiler

The pipework

The pump

The storage cylinder

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When using a Y-Plan pumped system, which of the following is incorrect?

Compliant with Building Regulations Document L

It can be zoned

Can be used with system boilers

Can be used with sealed (pressurised) systems

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In a fully pumped system, the minimum height the open vent should be from the water level in the cistern to the top of the open vent pipe is:

300mm

350mm

400mm

450mm

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following would not be available if you used a sealed system with system boiler?

Full thermostatic control

Anti-cycling boiler interlock

Instantaneous hot water supply

Compliancy with Building Regulations Document L

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?