1.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

When inspecting propane containers, defects include which of the following?

(Choose all that apply.)

rust

heat damage

dents

expired date

incorrect grade bolts

2.

REORDER QUESTION

1 min • 1 pt

When completing the PDI for inspecting propane containers, what is the correct order for the inspection?

Use appropriate PPE including safety glasses and gloves

Correctly identify corrective action

Correctly identify defects in the container

Correctly identify recommendation for container

3.

REORDER QUESTION

1 min • 1 pt

Place the steps in order for the correct technique when measuring the dent depth and width of a propane container.

Refer to the chart for propane tank dents

Make a recommendation

Use a ruler or tape measure to measure the distance from the bottom of the dent to the bottom of the crossing of the straight edge

Use a straight edge to measure the diameter of the dent

Place a straight edge across the dent

4.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

When should a technician perform the four propane system procedures?

(Choose all that apply.)

during a typical PDI

when troubleshooting and diagnosing appliance malfunctions

after disconnecting the propane system to replace any component

when in doubt

5.

DRAG AND DROP QUESTION

1 min • 1 pt

The purpose of the RV propane testing system is o determine, with ​ (a)   accuracy, the RV propane delivery system is ​ (b)   and that the ​ (c)   is operating properly.

100%
leak-free
pressure regulator
50%
75%
set up correctly
manometer

6.

DRAG AND DROP QUESTION

1 min • 1 pt

According to NFPA 1192 (5.3.20.1): After appliances are ​ (a)   the piping system, ​ (b)   piping system shall be proven ​ (c)   to be ​ (d)   by maintaining an air pressure of...

connected to
the entire
by test
leak-free
disconnected from
most of the
manually
by observation

7.

DRAG AND DROP QUESTION

1 min • 1 pt

Per NFPA 1192, 5.3.20.1: ...the entire piping system must maintain an air pressure of not less than ​ (a)   ​ water column or more than ​ (b)   water column.

8 in.
14 in.
5 in.
10 cm.
12 in.
6 in.
24 cm.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?