Phase 1 revision 1

Phase 1 revision 1

Professional Development

20 Qs

quiz-placeholder

Similar activities

Phase 2 Exam prep 2

Phase 2 Exam prep 2

Professional Development

20 Qs

Metering Devices

Metering Devices

Professional Development

20 Qs

Central Heating Systems

Central Heating Systems

Professional Development

21 Qs

Journeyman 1

Journeyman 1

Professional Development

25 Qs

Install home fire sprinkler systems

Install home fire sprinkler systems

Professional Development

22 Qs

Processes 6035-02 | Part 3

Processes 6035-02 | Part 3

Professional Development

25 Qs

6035 Level 2 Drainage

6035 Level 2 Drainage

Professional Development

20 Qs

Wet System Components

Wet System Components

Professional Development

15 Qs

Phase 1 revision 1

Phase 1 revision 1

Assessment

Quiz

Professional Development

Professional Development

Hard

Created by

Anthony Price

Used 2+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which member of the site management team advises on how a project can be constructed within the clients financial budget?

The building surveyor

The estimator

The clerk of works

The quantity surveyor

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following is the Building Inspector employed by?

The HSE

The local authority

The client

The main contractor

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

LCS pipe is given a colour band to indicate its grade. What grade is indicated by a blue band?

Light

Medium

Heavy

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following plastic pipe materials is commonly used for the distribution of underground mains cold water supplies?

Polybutylene

ABS

PVCu

MDPE

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the maximum diameter a hole can be drilled in a joist?

10% of the depth of the joist

20% of the depth of the joist

25% of the depth of the joist

30% of the depth of the joist

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

When installing 28mm copper pipe in the horizontal plane, what is the recommended clipping distance?

1.8m

2.4m

2.7m

3.0m

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which colour identifies wholesome water when installing MDPE pipework?

Yellow

Orange

Green

Blue

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?