SOPS 09/08/23

SOPS 09/08/23

Professional Development

6 Qs

quiz-placeholder

Similar activities

Parts of an aircraft

Parts of an aircraft

Professional Development

10 Qs

Section 4 PSTAR

Section 4 PSTAR

11th Grade - Professional Development

8 Qs

Helicopter Operations

Helicopter Operations

Professional Development

10 Qs

Approach Control Equipment & Procedures

Approach Control Equipment & Procedures

Professional Development

9 Qs

Aircraft Emergency Handling & Response

Aircraft Emergency Handling & Response

Professional Development

10 Qs

IAS 40

IAS 40

Professional Development

11 Qs

random aviation quiz

random aviation quiz

Professional Development

10 Qs

Facts on Airplanes

Facts on Airplanes

KG - Professional Development

10 Qs

SOPS 09/08/23

SOPS 09/08/23

Assessment

Quiz

Other

Professional Development

Easy

Created by

Theory Lecturer

Used 2+ times

FREE Resource

6 questions

Show all answers

1.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

What are the criteria to meet stable gate requirements on a normal approach? (tick all that apply)

The landing / final checklist is complete

The aircraft speed is not more than 10kt above, or 5kt below, target airspeed


The aircraft is in the correct landing configuration or there is only one more stage of flap to be deployed to achieve the landing configuration


Sink rate is no greater than 700 ft per minute; if an approach requires a sink rate greater than 700ft per minute, a special briefing should be conducted

The aircraft is established on the correct flight path (lateral and vertical)

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If a crew member is not able to perform a flight at the allocated time, notification shall be given to the appropriate staff member not less than how many minutes prior to the scheduled off-blocks time?

90 minutes

30 minutes

60 minutes

120 minutes

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What indicated airspeed must your aircraft be at or before reaching the yellow cones on grass runway 02/20 during take-off?

30kts IAS

50kts IAS

40kts IAS

45kts IAS

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the maximum number of aircraft permitted in the West Melton circuit at any one time?

6

7

5

4

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To mitigate the risk of a near miss occurring during the Miners departure and arrival, when weather allows; aircraft on a Miners Departure shall maintain _ft AMSL and aircraft on a Miners Arrival shall track as noted below and start a gradual descent to _ft between Aylesbury and West Junction. (Fill in the gaps)

1500, 1300

1300, 1500

1200, 1500

1500, 1200

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The PF shall nominate a touchdown point for every landing. The touchdown point shall be within _ of the runway ? (fill in the gap)

the first half

the first quarter

the touchdown point can be anywhere on the runway

the first third