1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

There was a packaging design issue, Too many iterations for improvement after design is fixed makes it kind of messy.

Quigo polaris

GCL2-50

Iron throne

Golden throne

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The recycled material housing need be with mark 'R', other material should not. Supplier made a mistake by marking both of them marked with 'R', caused 1 week production stop and 5 pallets hold for 2 months.

Quigo polaris

GLL3-80

HULK

Quigo polar bear

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Pendulum datum changed after the PCD workshop & MAE input meeting, the drawing update was not notified by the design engineer. But the MAE fabrication is already in progress.

AL 360

AL 180

Quigo Green

Quigo Blue

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

    Project schedule changed too frequently. As project members found it difficult to keep an overview of what is happening with the project.

Jedi

Yoda

Atino

Mandalorian

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Documentation: confusing, scattered, saved in different locations

Yoda

Yolanda

Darth Vader

GCL2-50

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Driver PCBA layout changes after B-sample, impact on the process of soldering.

AL 90

AL 180

AL 360

GPL100

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?