BIM fundamental - past exam

BIM fundamental - past exam

University

81 Qs

quiz-placeholder

Similar activities

Types of Metals (Ferrous/Nonferrous)

Types of Metals (Ferrous/Nonferrous)

University

81 Qs

VDA - Building

VDA - Building

University

86 Qs

ULTIMATE SPP QUIIZ

ULTIMATE SPP QUIIZ

University

76 Qs

ISME Exam 1

ISME Exam 1

University

84 Qs

тест

тест

University

80 Qs

CHACHA

CHACHA

University

78 Qs

ANH VAN

ANH VAN

University

83 Qs

SMKSBS SCI F3 2024

SMKSBS SCI F3 2024

2nd Grade - University

77 Qs

BIM fundamental - past exam

BIM fundamental - past exam

Assessment

Quiz

Architecture

University

Medium

Created by

Sarah Tam

Used 4+ times

FREE Resource

81 questions

Show all answers

1.

OPEN ENDED QUESTION

3 mins • 1 pt

What is BIM?

Evaluate responses using AI:

OFF

Answer explanation

A BIM is a digital representation of physical and functional characteristics of a facility. With this it serves as reliable source of information about facility which will be helpful in its life cycle.

2.

OPEN ENDED QUESTION

3 mins • 1 pt

What are most important characteristics of a BIM model?

Evaluate responses using AI:

OFF

Answer explanation

1. Three-dimensional Geometry

2. Semantic information (walls, doors, slabs etc. which help in quantity take off and simulation).

3. Additional information such as material properties.

3.

OPEN ENDED QUESTION

3 mins • 1 pt

What are advantages of BIM Model or BIM?

Evaluate responses using AI:

OFF

Answer explanation

·       Reduction of planning errors: increased transparency over 2D design. Increase coordination among disciplines and single source of truth leading to improved data management.

·       Reduction of error in tendering: model-based quantity takes off.

·       Increase of transparency in project execution: because of model based construction progress monitoring.

·       Improved communication with public and people attached to the project.

·       Early conflict and clash detection, proper data storage and management.

·       Better data quality; life cycle building management.

·       Budget reliability; no change order

·       Collaborative design gives higher building functionality.

·       Fast project delivery

·       Virtual simulation and rendering.

·       Prefabrication which reduces accidents on job site.

·       Reduction of error and extra efforts which arise due to manual addition of information in each phase.

·       Easily handover building information to the owner for its use in operational phase.

·       Cost efficiency, increase of productivity in construction, clash detection.

4.

OPEN ENDED QUESTION

3 mins • 1 pt

What are drawback of conventional 2D drawing?

Evaluate responses using AI:

OFF

Answer explanation

·       line drawings cannot be comprehensively understood by computers.

·       Basing the information flow on drawings alone often lead to errors

·       Design changes are particularly challenging: if they are not continuously tracked and relayed to all related plans, inconsistencies can easily arise and often remain undiscovered until the actual construction.

·       The conventional drawings cannot be used directly for downstream applications such as simulations, analysis, rendering but must be put into manually thus involve additional effort, cost and errors.

·       After project realization, the owner must put an extra effort and cost to insert information from these drawings into facility management for building operation thus accepting extra cost, effort and errors

5.

OPEN ENDED QUESTION

3 mins • 1 pt

Advantages of BIM over conventional drawing?

Evaluate responses using AI:

OFF

Answer explanation

Ø  Consistency as derived from single drawing, coordination, quantity take off, simulation and rendering.

6.

OPEN ENDED QUESTION

3 mins • 1 pt

What are different software used for BIM?

Evaluate responses using AI:

OFF

Answer explanation

  1. 1. BIM authoring tools: Autodesk revit, Graphisoft archicad, Nemetschek Allplan, TEKLA structures, siemen NX, Dssault Catia etc.

  2. 2. Facility management tools: Bentley Facilities, Autodesk Ops, Nemechek Allfa, EcoDomus.

  3. 3. Structure analysis: Sofistik, SAP, Revit.

  4. 4. BOQ: Nova AVA, ORCA AVA, BIM4U.

  5. 5. Construction scheduling: Bexel manager, Autodesk Naviswork.

7.

OPEN ENDED QUESTION

3 mins • 1 pt

What is the BIM use cases? Provide a definition of a term. Name 4 different BIM use cases defined by the German ministry of transport.

Evaluate responses using AI:

OFF

Answer explanation

BIM use case means that for which purpose the model of the BIM will be used. It depends on requirement of employer.

Some use cases highlighted by German ministry of transport are:

Initial State Modeling, Design analysis, Visualization,

Coordination, Safety design, cost estimation,

BOQ, tendering, detailed design, 4D models,

logistic planning, progress monitoring,

issue management, operation and maintenance.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?