Technical Civil 001

Technical Civil 001

University

30 Qs

quiz-placeholder

Similar activities

ASAS I BI. KLS 5_2024/2025

ASAS I BI. KLS 5_2024/2025

5th Grade - University

25 Qs

ACE 26/04/20 HRA

ACE 26/04/20 HRA

University

25 Qs

Core 05 Walls, floors, concrete and additives

Core 05 Walls, floors, concrete and additives

KG - University

25 Qs

CIVIL ENGINEERING MAINTENANCE

CIVIL ENGINEERING MAINTENANCE

University

25 Qs

Design of Concrete Structures (Set-2)

Design of Concrete Structures (Set-2)

University

25 Qs

CIVL 2290A Exam 2 Review

CIVL 2290A Exam 2 Review

University

27 Qs

Design of Concrete Structures (set-8)

Design of Concrete Structures (set-8)

University

25 Qs

Developmental Psychology Tut #2 Education

Developmental Psychology Tut #2 Education

10th Grade - University

26 Qs

Technical Civil 001

Technical Civil 001

Assessment

Quiz

Other

University

Hard

Created by

BARATH KUMAR

Used 3+ times

FREE Resource

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

The Strength of Cement Concrete for a given mix depends on

Water-cement ratio

Initial setting time

Final setting time

None of the above

2.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

The property of fresh concrete in which the water in the mix tends to rise to the surface of concrete while placing and compaction

Bleeding

Creep

Shrinkage

Segregation

3.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

M25 grade of concrete approximates to

1:3:6

1:1:2

1:2:4

1:1.5:3

4.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

Which of the following test gives the workability of concrete?

Compression test

Compaction factor test

Split tension test

Flexural test

5.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

As per IS specification full strength of concrete is attained after ___ days of Casting.

7

21

28

14

6.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

The Main reinforcement in the RCC cantilever members is placed at

Top fibre

Bottom fibre

Side fibre

Top fibre and Bottom fibre

7.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

The partial Safety factor for Concrete in limit state design is

1.25

1.00

1.50

1.15

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?