STEM Project Basics

STEM Project Basics

12th Grade

18 Qs

quiz-placeholder

Similar activities

Safety Video Quizizz

Safety Video Quizizz

6th - 12th Grade

17 Qs

VCE Psychology Key Science Skills

VCE Psychology Key Science Skills

11th - 12th Grade

20 Qs

Chemistry Lab Equipment and Safety

Chemistry Lab Equipment and Safety

11th Grade - University

15 Qs

Scientific Method

Scientific Method

6th Grade - University

15 Qs

Midterm Review # 1 (Safety and Measurement)

Midterm Review # 1 (Safety and Measurement)

9th - 12th Grade

20 Qs

WHMIS Symbols/Lab Safety

WHMIS Symbols/Lab Safety

9th - 12th Grade

18 Qs

Mole Chalk Mini-Lab

Mole Chalk Mini-Lab

11th Grade - University

15 Qs

Lab Safety, Scientific Method

Lab Safety, Scientific Method

8th - 12th Grade

13 Qs

STEM Project Basics

STEM Project Basics

Assessment

Quiz

Science

12th Grade

Easy

NGSS
MS-ETS1-4, MS-ETS1-1, MS-ETS1-2

+2

Standards-aligned

Created by

Christina Gonzales

Used 2+ times

FREE Resource

18 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Media Image

What team role is in charge of writing the notes and observations and data during the creation, testing, and improvement phases of the engineering design process?

Leader

Annotator

Time Keeper

Inventory Manager

2.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

What part of the lab report requires the visual dimension, scale, and labeling of the design?

Procedure

Conclusion

Blueprint

Data

Tags

NGSS.MS-ETS1-4

3.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Which team role is in charge of organizing, labeling, collecting, and putting away supplies?

Leader

Annotator

Time Keeper

Inventory Manager

4.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

What part of the lab report helps create a plan for the design?

Objective

Procedure

Data

Conclusion

Tags

NGSS.MS-ETS1-1

NGSS.MS-ETS1-4

5.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Media Image

What part of the Engineering Design Process requires the students to brainstorm ideas?

Imagine

Investigate

Communicate

Create

6.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Which team role is required to take on the role of a missing team member?

Leader

Annotator

Time Keeper

Inventory Manager

7.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Which best describes a design constraint?

limitations on a design

requirements or goal

expected setbacks

modifications after testing

Tags

NGSS.MS-ETS1-1

NGSS.MS-ETS1-2

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?