CHAPTER 5: FOUNDATION

Authored by Neko S

Other

University

Used 1+ times

CHAPTER 5: FOUNDATION
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

85 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Prior to the design and construction of a given foundation, the _____ at the site must be reliably determine.

dewatering

ground water level

soil

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If the ground water is high, some of the following problems are encountered. What are these problems?

Foundation drainage

Dewatering the site during construction

Waterproofing or dampproofing

All of the above

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Sometimes the cost of dewatering the site is excessive and consequently the total construction cost may be high.

True

False

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When construction is made below the ground water level, the site must be dewatered.

True

False

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A cost comparison should be made for all feasible types of foundations or schemes of substructures from which the most _____ design can be selected.

economical

stable

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The amount of free water that will flow into the excavation is difficult to predict. Under such circumstances, the design must be made _____ enough so that it can be adjusted to suit the actual conditions

fixed

flexible

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

_____ necessary for deep excavation in permeable soils.

Extensive dewatering

Little dewatering

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?