MTS Drilling D245s

MTS Drilling D245s

Professional Development

15 Qs

quiz-placeholder

Similar activities

QUIZ PM D375A-6R DAY 2

QUIZ PM D375A-6R DAY 2

Professional Development

10 Qs

Steering 4 L2

Steering 4 L2

Professional Development

10 Qs

Air Supplies

Air Supplies

Professional Development

10 Qs

post test CRI kelas XI

post test CRI kelas XI

Professional Development

15 Qs

Level 3 phase 1 central heating questions

Level 3 phase 1 central heating questions

Professional Development

10 Qs

Requirements for System Types

Requirements for System Types

Professional Development

20 Qs

Kuis Honda PCX 160 Roadsync

Kuis Honda PCX 160 Roadsync

Professional Development

10 Qs

Brakes - part 3

Brakes - part 3

Professional Development

13 Qs

MTS Drilling D245s

MTS Drilling D245s

Assessment

Quiz

Professional Development

Professional Development

Easy

Created by

Agus Ernanto

Used 3+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Rated RPM engine pada D245s :

1200

1800

2100

1950

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Intake air system pada engine D245 S :

With Aftercooler

Turbocharger with aftercooler

Turbocharger with air to air aftercooler

Two stage turbocharger with aftercooler

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Untuk mengoperasikan travel Tram Foot Switch (TFS) harus diaktifkan,TFS akan memberikan signal current menuju

RBS (Right Brake Solenoid)

LBS (Left Brake Solenoid)

PVS (Pump Vent Solenoid)

A,B,dan C benar semua

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Digunakan untuk membantu meringankan beban engine / starting motor saat awal start :

Bypas Regulator

Final blowdown

Cold weather solenoid valve

By pass solenoid valve

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Saat Engine running dan flushing tidak aktif, maka air pressure dari running blowdown akan diteruskan menuju :

Port P2

Port V1 dan V2 / Suction Compressor

Atmospher melalui muffler

Discharge Air End Compressor

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Berfungsi untuk membatasi maximal pressure pulldown & mencegah machine drill terangkat :

Maximal pressure pulldown

Fast feed check valve

Holding valve

Lift off valve

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Travel bisa Bergerak dengan syarat, kecuali :

Tram foot Switch release di injak

Jack Cylinder belum full stroke

Travel lever linkage ditarik ke depan atau ke belakang

Hydraulic pump RH dan LH presure nya 3400 psi

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?