
Cost Estimation - BBPOOTS Project
Quiz
•
Business
•
12th Grade
•
Practice Problem
•
Medium
Mark Fisher
Used 1+ times
FREE Resource
Enhance your content in a minute
10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What are the different cost estimation techniques?
Delphi method
expert judgment
analogous estimation, parametric estimation, bottom-up estimation, and three-point estimation
top-down estimation
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Name three types of cost estimation methods.
Three-point Estimating
Analogous Estimating, Parametric Estimating, Bottom-up Estimating
Top-down Estimating
Expert Judgment
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
In project management, what is the purpose of cost estimation?
To track the progress of a project
To determine the approximate cost of a project before it is executed.
To evaluate the quality of project deliverables
To assign tasks to team members
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What factors are considered in cost estimation for manufacturing?
energy costs, packaging costs, marketing costs, and production time
maintenance costs, research and development costs, marketing costs, and production volume
labor costs, material costs, overhead costs, equipment costs, and production volume
raw material costs, transportation costs, marketing costs, and production time
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What are the key components of cost estimation in construction?
labor costs, material costs, equipment costs, subcontractor costs, overhead costs, and contingency costs
design costs
permit costs
transportation costs
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which cost estimation technique is based on historical data and statistical analysis?
Parametric estimation
Expert judgment
Bottom-up estimation
Analogous estimation
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the difference between top-down and bottom-up cost estimation methods?
Top-down cost estimation starts with the individual components and then aggregates them to get the overall estimate.
Top-down cost estimation starts with an overall estimate and then breaks it down into smaller components, while bottom-up cost estimation starts with the individual components and then aggregates them to get the overall estimate.
Top-down cost estimation is more accurate than bottom-up cost estimation.
Bottom-up cost estimation starts with an overall estimate and then breaks it down into smaller components.
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?
Similar Resources on Wayground
10 questions
Chapter 1 Business Activity
Quiz
•
11th Grade - University
15 questions
Understanding SWOT Analysis Concepts
Quiz
•
12th Grade - University
11 questions
Break-even and contribution
Quiz
•
11th Grade - University
10 questions
marketing 20.1
Quiz
•
12th Grade
15 questions
Trading Psychology Quiz 6
Quiz
•
12th Grade
15 questions
Unit 3 LOF
Quiz
•
12th Grade
10 questions
Topic 1 Quiz 2 PLC and Ltd
Quiz
•
11th - 12th Grade
15 questions
Business Finance Reviewer
Quiz
•
12th Grade
Popular Resources on Wayground
15 questions
Fractions on a Number Line
Quiz
•
3rd Grade
20 questions
Equivalent Fractions
Quiz
•
3rd Grade
25 questions
Multiplication Facts
Quiz
•
5th Grade
54 questions
Analyzing Line Graphs & Tables
Quiz
•
4th Grade
22 questions
fractions
Quiz
•
3rd Grade
20 questions
Main Idea and Details
Quiz
•
5th Grade
20 questions
Context Clues
Quiz
•
6th Grade
15 questions
Equivalent Fractions
Quiz
•
4th Grade
