Basic Safety Measures during Start-up

Basic Safety Measures during Start-up

8th Grade

10 Qs

quiz-placeholder

Similar activities

Fibres

Fibres

8th Grade

10 Qs

General Knowledge (TEST)

General Knowledge (TEST)

KG - 12th Grade

10 Qs

Year 8 Flex 10 Nov 2022

Year 8 Flex 10 Nov 2022

8th Grade

12 Qs

Clash Of Clans

Clash Of Clans

1st - 10th Grade

11 Qs

  CHN 1 EXPANDED  PROGRAM ON IMMUNIZATION

CHN 1 EXPANDED PROGRAM ON IMMUNIZATION

7th Grade - University

15 Qs

Fruits and Vegetables

Fruits and Vegetables

4th - 8th Grade

14 Qs

BGS Music Quiz

BGS Music Quiz

1st - 12th Grade

10 Qs

rubiks cube quiz

rubiks cube quiz

KG - Professional Development

13 Qs

Basic Safety Measures during Start-up

Basic Safety Measures during Start-up

Assessment

Quiz

Other

8th Grade

Hard

Created by

Aru Beket

Used 1+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be checked before start-up to ensure compliance with technical documentation and regulations?

Availability of operational and technical documentation

Cleaning of industrial premises and outdoor installations

Checking the availability and serviceability of technological alarm systems

Completion of shifts by trained personnel

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be checked to ensure the availability of means of communication, alarm, fire extinguishing, and personal and collective protection at workplaces?

Availability of operational and technical documentation

Checking the availability and serviceability of technological alarm systems

Equipment of workplaces with means of communication, alarm, fire extinguishing, personal and collective protection

Checking the serviceability of static electricity protection systems

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done to ensure the readiness of indoor heating systems and technological communications in winter?

Checking and switching on indoor heating systems and technological communications in winter

Checking the tightness of equipment and communications of all installation systems

Inspection and refueling of pumping and compressor oil systems

Acceptance of raw materials, auxiliary materials, step-by-step start-up of equipment

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done to prevent spills, increased discharges into the sewer, and increased discharges to the torch?

Checking the availability and serviceability of technological alarm systems

Checking the tightness of equipment and communications of all installation systems

Acceptance of raw materials, auxiliary materials, step-by-step start-up of equipment

Completion of shifts by trained personnel

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done to prevent supercooling of devices and communications related to the processing of liquefied gases?

Checking the availability and serviceability of technological alarm systems

Checking the tightness of equipment and communications of all installation systems

Acceptance of raw materials, auxiliary materials, step-by-step start-up of equipment

Checking and putting into operation means of control and regulation of flow, pressure, temperature, levels

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What precautions should be taken to prevent spills, increased discharges into the sewer, and increased discharges to the torch?

Regularly checking the availability and serviceability of technological alarm systems

Ensuring the tightness of equipment and communications of all installation systems

Implementing raw materials acceptance procedures and step-by-step equipment start-up

Conducting shifts with trained personnel

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How can the readiness of indoor heating systems and technological communications be ensured in winter?

Checking and activating indoor heating systems and technological communications in winter

Ensuring the tightness of equipment and communications of all installation systems

Inspecting and refueling pumping and compressor oil systems

Implementing raw materials acceptance procedures and step-by-step equipment start-up

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?