27105 Floor Framing  CC's

27105 Floor Framing CC's

9th - 12th Grade

20 Qs

quiz-placeholder

Similar activities

AG Module 4 Ceiling Joists and Roof Framing

AG Module 4 Ceiling Joists and Roof Framing

10th - 12th Grade

23 Qs

Rule of thirds

Rule of thirds

8th Grade - University

25 Qs

Tech 1 MOY Assessment

Tech 1 MOY Assessment

12th Grade

25 Qs

Obj 3.01 Architectural Basics

Obj 3.01 Architectural Basics

9th - 12th Grade

20 Qs

Hand Tools 2.0.0

Hand Tools 2.0.0

11th - 12th Grade

20 Qs

RESIDENTIAL ELECTRICAL

RESIDENTIAL ELECTRICAL

9th Grade - University

20 Qs

ServSafe Chapter 12 Review

ServSafe Chapter 12 Review

12th Grade

20 Qs

Photography

Photography

10th Grade - Professional Development

20 Qs

27105 Floor Framing  CC's

27105 Floor Framing CC's

Assessment

Quiz

Specialty

9th - 12th Grade

Hard

Created by

Christopher Foy

Used 5+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The plan that shows the entire substructure below the first floor is called the​ _____ plan.


elevation

foundation

plot

floor

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The drawing that is typically drawn larger than scale is the​ _____.


floor plan

site drawing

foundation plan

detail drawing

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

On which drawing would you find the​ location, size, and spacing of anchor​ bolts?


Structural drawing


Sectional drawing


Detail drawing


Foundation drawing


4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The part of the drawing that shows information about​ scale, the date of the last​ revision, and the drawing number is the​ _____.


schedule

title block

legend

appendix

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The type of framing typically used to counteract wind loads in​ hurricane-prone areas is​ _____.


Timber framing


Post and beam framing


Platform framing


Balloon framing


6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt


In balloon​ framing, the second floor joist sits on a horizontal framing member called a​ _____.


strongback

brace

ribbon

purlin

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In platform​ framing, settling can be minimized by using wood with moisture content of approximately​ _____ %.


25

9

6

19

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?