
Jenica
Authored by debra mccarthy
Professional Development
12th Grade

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
39 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Before issuing a building permit, most communities require a builder or an owner to first furnish a
Floor plan
Architects rendering
Plot plan
Contract
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
measuring tapes for long distances are available available in the length of
10 to 100 feet
50 to 300'
50 to 500'
100 to 500'
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Property lines are located and marked by the
Engineer
Builder
Property owner
Surveyor
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
which of the following are other names, used for a builders level
Dumpy level
Optical level
Grading level
Both a and B
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When, adjusting a builders level for levelness, the bubble in the level vile will travel in the direction that your
Left thumb moves
Right thumb moves
Telescope is pointed
None of the above
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
surveyors in the United States typically use measuring tapes graduated in
Feet inches and eighths of an inch
Meters centimeters and millimeters
Feet decimal parts of a foot
Yards feet and inches
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
a device similar to the builders level but with the ability to measure vertical angles is called a
Spirit level
Sextant
Chronoscope
Transit
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?