Search Header Logo

Jenica

Authored by debra mccarthy

Professional Development

12th Grade

Jenica
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

39 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Before issuing a building permit, most communities require a builder or an owner to first furnish a

Floor plan

Architects rendering

Plot plan

Contract

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

measuring tapes for long distances are available available in the length of

10 to 100 feet

50 to 300'

50 to 500'

100 to 500'

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Property lines are located and marked by the

Engineer

Builder

Property owner

Surveyor

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

which of the following are other names, used for a builders level

Dumpy level

Optical level

Grading level

Both a and B

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When, adjusting a builders level for levelness, the bubble in the level vile will travel in the direction that your

Left thumb moves

Right thumb moves

Telescope is pointed

None of the above

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

surveyors in the United States typically use measuring tapes graduated in

Feet inches and eighths of an inch

Meters centimeters and millimeters

Feet decimal parts of a foot

Yards feet and inches

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

a device similar to the builders level but with the ability to measure vertical angles is called a

Spirit level

Sextant

Chronoscope

Transit

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?