GMJ 6035 Electrical Mock *2

GMJ 6035 Electrical Mock *2

Professional Development

23 Qs

quiz-placeholder

Similar activities

Flemings Left Hand Rule

Flemings Left Hand Rule

Professional Development

19 Qs

Wastewater and Fresh Water

Wastewater and Fresh Water

7th Grade - Professional Development

19 Qs

M3 Cat A Mock

M3 Cat A Mock

Professional Development

22 Qs

KenGen Module I

KenGen Module I

Professional Development

20 Qs

Sustainable Future, Energy, Power

Sustainable Future, Energy, Power

University - Professional Development

20 Qs

Chapter 8: Ohm's Law & Power Law

Chapter 8: Ohm's Law & Power Law

Professional Development

23 Qs

Electricity stuff

Electricity stuff

KG - Professional Development

25 Qs

electricity

electricity

Professional Development

19 Qs

GMJ 6035 Electrical Mock *2

GMJ 6035 Electrical Mock *2

Assessment

Quiz

Science

Professional Development

Medium

Created by

Glen Johnson

Used 205+ times

FREE Resource

23 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Fault diagnosis reveals a serious fault in a domestic installation which could result in serious electric shock if nor rectified. Which one of the following persons should be informed immediately in this situation?

The health and safety executive

The local building control Authority

The owner/occupier of the property

The institute of engineering technology

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Fault diagnosis is being undertaken in a building during non-working hours (when the building is unoccupied). A serious and life-threatening fault is discovered to the wiring of a circuit and rectification of the fault will require major works. Which one of the following actions would be the most appropriate in this situation?

The circuit should remain un-touched until a suitable meeting with the client is arranged

The circuit should be securely isolated until the client can be informed of the risk

The circuit should be stripped out until an agreement to rewire it is made

The section of the building concerned should be cordoned-off and notices posted

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following is the most likely consequence if a loose neutral connection within a lighting circuit is not rectified?

Increased energy bills

Fire

  Electric shock

Burns

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following is the reason for applying temporary continuity bonds to pipe work?

They are applied after cutting a section of plastic pipe to minimise the risk of electric shock should the pipe be carrying a residual fault current

They are applied before cutting a section of plastic pipe to minimise the risk of electric shock should the pipe be carrying a residual fault current

They are applied after cutting a section of metallic pipe to minimise the risk of electric shock should the pipe be carrying a residual fault current

They are applied before cutting a section of metallic pipe to minimise the risk of electric shock should the pipe be carrying a residual fault current

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following tools would be used to cut a copper conductor within a flexible cable to the correct length?

Hacksaw

Jigsaw

Side cutters

Craft knife

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following types of connection is a commonly used within a joint box used in domestic wiring systems?

Screw

Compression

Crimp

Clamp

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following tests would use a test voltage of 500 V d.c.?

Continuity of protective conductors

Continuity of ring final circuits

Insulation resistance

Polarity

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?