Hot Water Systems Quiz L3P2U6,1.8;2

Hot Water Systems Quiz L3P2U6,1.8;2

Professional Development

10 Qs

quiz-placeholder

Similar activities

Basic Hydraulics Mod 5 Pressure Control Circuits

Basic Hydraulics Mod 5 Pressure Control Circuits

Professional Development

10 Qs

fuel scavenge system

fuel scavenge system

Professional Development

10 Qs

8202 Level 3 Drainage 2

8202 Level 3 Drainage 2

Professional Development

15 Qs

Periodical Service GD705

Periodical Service GD705

Professional Development

15 Qs

pneumatic system

pneumatic system

2nd Grade - Professional Development

14 Qs

Managing Abnormal Operation Condition

Managing Abnormal Operation Condition

1st Grade - Professional Development

15 Qs

E-Mentor Truck 1

E-Mentor Truck 1

Professional Development

15 Qs

Let's Play- Engineering for Healthy Planet

Let's Play- Engineering for Healthy Planet

Professional Development

10 Qs

Hot Water Systems Quiz L3P2U6,1.8;2

Hot Water Systems Quiz L3P2U6,1.8;2

Assessment

Quiz

Other

Professional Development

Hard

Created by

Craig Boothright

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the D1 discharge pipework in a hot water system?

To remove water from the expansion relief valve

To remove water from the temperature relief valve

To remove water from the pressure relief valve

To remove water from both the pressure relief valve and the temperature relief valve

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are the two sections of the discharge pipework separated by?

A storage vessel

A manifold

A safety device

A tundish

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

According to the Regulations, what should the D1 pipework be made of?

Plastic

Cross-linked polyethylene

Polybutylene

Metal

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the maximum length of the D1 pipework?

300mm

500mm

400mm

600mm

5.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

What is the main requirement of the D2 pipework?

To be made of metal

To be made of plastic

To be visible at the tundish

To have a fall of at least 1:200

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How much pipe must be showing on the D2 pipework below the tundish before any changes of direction?

400mm

200mm

300mm

100mm

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the maximum termination distance of D2 low level discharge above the ground?

100mm

125mm

75mm

50mm

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?