10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the D1 discharge pipework in a hot water system?

To remove water from the expansion relief valve

To remove water from the temperature relief valve

To remove water from the pressure relief valve

To remove water from both the pressure relief valve and the temperature relief valve

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are the two sections of the discharge pipework separated by?

A storage vessel

A manifold

A safety device

A tundish

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

According to the Regulations, what should the D1 pipework be made of?

Plastic

Cross-linked polyethylene

Polybutylene

Metal

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the maximum length of the D1 pipework?

300mm

500mm

400mm

600mm

5.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

What is the main requirement of the D2 pipework?

To be made of metal

To be made of plastic

To be visible at the tundish

To have a fall of at least 1:200

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How much pipe must be showing on the D2 pipework below the tundish before any changes of direction?

400mm

200mm

300mm

100mm

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the maximum termination distance of D2 low level discharge above the ground?

100mm

125mm

75mm

50mm

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?