
Hot Water Systems Quiz L3P2U6,1.8;2
Authored by Craig Boothright
Other
Professional Development

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the purpose of the D1 discharge pipework in a hot water system?
To remove water from the expansion relief valve
To remove water from the temperature relief valve
To remove water from the pressure relief valve
To remove water from both the pressure relief valve and the temperature relief valve
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What are the two sections of the discharge pipework separated by?
A storage vessel
A manifold
A safety device
A tundish
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
According to the Regulations, what should the D1 pipework be made of?
Plastic
Cross-linked polyethylene
Polybutylene
Metal
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the maximum length of the D1 pipework?
300mm
500mm
400mm
600mm
5.
MULTIPLE SELECT QUESTION
45 sec • 1 pt
What is the main requirement of the D2 pipework?
To be made of metal
To be made of plastic
To be visible at the tundish
To have a fall of at least 1:200
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
How much pipe must be showing on the D2 pipework below the tundish before any changes of direction?
400mm
200mm
300mm
100mm
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the maximum termination distance of D2 low level discharge above the ground?
100mm
125mm
75mm
50mm
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?