1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is Commissioning?

Inspection before construction is done.

Testing a system that already integrated to meet project specification requirement.

A delicious food from Jogjakarta

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Before commissioning phase, what is phase that must be passed?

Loop test

Field inspection test

Pre-comm

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is pre commissioning activity?

inspection and examinations of the equipment, devices, to make sure they are installed and working properly according to the specification

Calibration field instrument

Function acceptance test

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one below is the correct one for sequence of fire and gas panel test?

Measure to confirm the incoming supply for F&G panel is 24 VDC

Visual Inspection of Fire and Gas Panel to ensure that the components are in normal condition after installation.

A and B are correct

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is HSE stand for?

Health safety and environment

High sensitive environment

High safety environment

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?