LSSBB

LSSBB

Professional Development

15 Qs

quiz-placeholder

Similar activities

Taller de Retrospectiva

Taller de Retrospectiva

Professional Development

16 Qs

Basic Archery

Basic Archery

Professional Development

15 Qs

WB EMEA Quizz

WB EMEA Quizz

Professional Development

10 Qs

5S Concepts Quiz

5S Concepts Quiz

Professional Development

15 Qs

ASM ADP || Lean Six Sigma || Measure Phase

ASM ADP || Lean Six Sigma || Measure Phase

Professional Development

15 Qs

Breakthrough Performance

Breakthrough Performance

Professional Development

15 Qs

Health/Nutrition Quiz

Health/Nutrition Quiz

Professional Development

20 Qs

LoTD IV - Minggu I

LoTD IV - Minggu I

Professional Development

10 Qs

LSSBB

LSSBB

Assessment

Quiz

Professional Development

Professional Development

Practice Problem

Medium

Created by

Khushbu Ahuja

Used 5+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

Six Sigma is a managerial approach designed to create processes resulting in at most how many defects?

340 defects per million

34 defects per 100,000

34 defects out of 10,000

3.4 defects per million

2.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

Which is a visual tool that displays all critical steps in a specific process and quantifies easily the time and volume taken at each stage

Andon

Kamban

VSM

Core Competency

3.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

The reason that most companies implement lean six sigma?

Reduce variation

Improve profit

Reduce waste

Increase customer satisfaction

All Above

4.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

Total Production Managment emphasis on

Preventive Maintenance

Predictive Maintenance

Both

None of above

5.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

What are the stages of Formal Kaizen

Preparation

Pre Kaizen

Implementation

Followup

Preparation

Followup

Pre Kaizen

Implementation

Preparation

Followup

Implementation

Pre Kaizen

Preparation

Followup

Pre Kaizen

Implementation

6.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

Cost of Quality is divided into 2 areas, what are those

Cost of Conformance (CoC)

&

Cost of Non Conformance (CoNC)

Pre development cost

&

Transportation cost

None of above

Both A & B

7.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

Which if Intellectual Property/Asset of the company

Employees

Financial resource

Infrastructure

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?

Discover more resources for Professional Development