A pump is required to lift water to a storage cistern at height. A delivery rate of 5kg/s is required and the total length of pipework (including pipe valves and fittings) is 40m. Given a pump efficiency of 75%, what is the required power of the pump in watts?

GMJ 9189 PHASE 3 cold water MCQ part 2

Quiz
•
Science
•
Professional Development
•
Easy
Glen Johnson
Used 7+ times
FREE Resource
10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
1,765 watts
1,962 watts
2,609 watts
2,995 watts
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What should be fitted to the water supply feeding an accumulator to prevent the latter becoming damaged?
Strainer, check valve and pressure reducing valve
Strainer, check valve and gauge
Check valve, pressure relief valve and gauge
Check valve, water softener and regulating valve
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
If the mains pressure to an accumulator is 3 bar, then what would be the most suitable air charge pressure within the vessel?
3 bar
2.5 bar
1.5 bar
0.5 bar
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
An accumulator has a storage volume of 180 litres. If it feeds a bath tap with a flow rate of 11 litres per minute, how long will the accumulator assist in increasing the pressure before it starts to replenish?
11 mins
16 mins
18 mins
22 mins
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A boosted cold water system is fitted with a break cistern at low level and a storage cistern at high level. The pump seems to have seized after ‘running dry’ for some time. What control component within the system is most likely to have failed and allowed this to happen?
Float operated valve within the storage cistern
Float operated level shut-off switch within the storage cistern
Float operated valve within the break cistern
Float operated low level shut-off switch within the break cistern
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What piece of test equipment is most suitable to check the run current of a boost cold water pump during maintenance or fault-finding activities?
Voltmeter
Multi-meter
Low resistance Ohmmeter
Clip-on Ammeter
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A CWSC is overflowing during off-peak periods. What is the most likely cause?
Blocked distribution pipe outlet
Faulty level switch
Split washer within FOV
Pressure reducing valve set too high
Create a free account and access millions of resources
Similar Resources on Quizizz
10 questions
Unit 05 – Cold Water Quiz L3P2 U5,2.4:2

Quiz
•
Professional Development
10 questions
Engine Tech Week 1

Quiz
•
Professional Development
10 questions
Cold Water Systems Quiz L3P2 U5,2.4:1

Quiz
•
Professional Development
7 questions
PP10 ch Boilers 1.2

Quiz
•
Professional Development
14 questions
PP9 Sanitation

Quiz
•
Professional Development
10 questions
Phase4Mod11devices

Quiz
•
Professional Development
14 questions
141 S19

Quiz
•
Professional Development
11 questions
Resistors

Quiz
•
Professional Development
Popular Resources on Quizizz
15 questions
Multiplication Facts

Quiz
•
4th Grade
20 questions
Math Review - Grade 6

Quiz
•
6th Grade
20 questions
math review

Quiz
•
4th Grade
5 questions
capitalization in sentences

Quiz
•
5th - 8th Grade
10 questions
Juneteenth History and Significance

Interactive video
•
5th - 8th Grade
15 questions
Adding and Subtracting Fractions

Quiz
•
5th Grade
10 questions
R2H Day One Internship Expectation Review Guidelines

Quiz
•
Professional Development
12 questions
Dividing Fractions

Quiz
•
6th Grade