Search Header Logo

EOY 2023 Mainframe Quiz

Authored by Kev Robertson

Other

Professional Development

Used 1+ times

EOY 2023 Mainframe Quiz
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

14 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

January saw Mainframe Hardware take delivery of two brand new processors onto the data centre floor. These processors would go on to provide significant reduction metrics supporting our carbon footprint challenge. What model were they :

z14

z15

z16

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

February saw the Batch team decommission the highest ever number of production jobs in a single month. These removals reduce mainframe CPU utilisation, ensure faster batch completion and removal of legacy which all have cost savings. How many jobs were removed :

1117

967

592

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

March as always saw the Mainframe Clock Change event take place. A significant challenge was thrown at our teams when it was decided to remove the planned Site Swap event from scope. How many days notice period did we receive to meet that challenge :

4

9

11

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

April saw the DB2 team carry out another large tranche of conversions of tables to Universal Table Space (UTS) format. UTS offers better space management, data availability and improved performance, which is crucial given the criticality of enterprise data and the speed at which we need access to. April saw over 1200 conversions but how many were done over the course of the year to complete work :

25k

35k

45k

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

May Capacity reporting showed us that we had in fact hit a peak day processing for the bank at the end of April. This peak was the highest we had seen in over 12 months. Capacity reporting and active month end reporting make these peak days seamless to our customers as the platform deals with the higher demand. For one of our key customer services Mobile Banking, how many logins per minute did we see at this peak time :

20k

15k

10k

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

June saw the AO team work with Capacity to increase the RMF data collection period during peak batch processing to reduce MIP utilisation. This work saved over 800mips and mitigates the risk of batch (rather than online processing) driving our peak processing and therefore avoiding unnecessary hardware costs. What was the data collection period increase :

10 seconds to 60 seconds

30 seconds to 45 seconds

45 seconds to 90 seconds

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

July saw the Network Software complete a piece of work to remove redundant/unused ports on the system. Unused ports can be reclaimed and reused so critical to controlling the growth and complexity of the network. Due to the nature of Dev / Sandpit systems this proved a challenging task, however after an extensive review to identify ports no longer required the team deleted how many unused ports :

3897

4596

8903

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?