
EOY 2023 Mainframe Quiz
Authored by Kev Robertson
Other
Professional Development
Used 1+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
14 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
January saw Mainframe Hardware take delivery of two brand new processors onto the data centre floor. These processors would go on to provide significant reduction metrics supporting our carbon footprint challenge. What model were they :
z14
z15
z16
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
February saw the Batch team decommission the highest ever number of production jobs in a single month. These removals reduce mainframe CPU utilisation, ensure faster batch completion and removal of legacy which all have cost savings. How many jobs were removed :
1117
967
592
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
March as always saw the Mainframe Clock Change event take place. A significant challenge was thrown at our teams when it was decided to remove the planned Site Swap event from scope. How many days notice period did we receive to meet that challenge :
4
9
11
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
April saw the DB2 team carry out another large tranche of conversions of tables to Universal Table Space (UTS) format. UTS offers better space management, data availability and improved performance, which is crucial given the criticality of enterprise data and the speed at which we need access to. April saw over 1200 conversions but how many were done over the course of the year to complete work :
25k
35k
45k
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
May Capacity reporting showed us that we had in fact hit a peak day processing for the bank at the end of April. This peak was the highest we had seen in over 12 months. Capacity reporting and active month end reporting make these peak days seamless to our customers as the platform deals with the higher demand. For one of our key customer services Mobile Banking, how many logins per minute did we see at this peak time :
20k
15k
10k
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
June saw the AO team work with Capacity to increase the RMF data collection period during peak batch processing to reduce MIP utilisation. This work saved over 800mips and mitigates the risk of batch (rather than online processing) driving our peak processing and therefore avoiding unnecessary hardware costs. What was the data collection period increase :
10 seconds to 60 seconds
30 seconds to 45 seconds
45 seconds to 90 seconds
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
July saw the Network Software complete a piece of work to remove redundant/unused ports on the system. Unused ports can be reclaimed and reused so critical to controlling the growth and complexity of the network. Due to the nature of Dev / Sandpit systems this proved a challenging task, however after an extensive review to identify ports no longer required the team deleted how many unused ports :
3897
4596
8903
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?