Chapter 8: Building Layout - Know & Understand

Chapter 8: Building Layout - Know & Understand

12th Grade

22 Qs

quiz-placeholder

Similar activities

Basic Tools Quiz

Basic Tools Quiz

6th - 12th Grade

20 Qs

Technology Education Terms

Technology Education Terms

9th - 12th Grade

25 Qs

Home and Furniture Vocabulary

Home and Furniture Vocabulary

10th Grade - University

20 Qs

Interior Design Review of Week One

Interior Design Review of Week One

9th - 12th Grade

25 Qs

D.T. Intro Quiz

D.T. Intro Quiz

7th - 12th Grade

20 Qs

Preparing for a Career in Architecture

Preparing for a Career in Architecture

10th - 12th Grade

20 Qs

Sustainable Architecture Quiz

Sustainable Architecture Quiz

11th Grade - University

22 Qs

TED 1.02 Review

TED 1.02 Review

9th - 12th Grade

18 Qs

Chapter 8: Building Layout - Know & Understand

Chapter 8: Building Layout - Know & Understand

Assessment

Quiz

Design

12th Grade

Hard

Created by

AJ Adame

Used 1+ times

FREE Resource

22 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

True or False? Zoning ordinances often regulate the minimum property setback.

True

False

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When establishing a building line with a measuring tape, use the _____ method to establish a square corner.

3-4-5

Squaring

Leveling

Differential

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

An alternative method to checking a floor system or wall system for square.

Squaring Method

Diagonal Method

Leveling Method

Framing Method

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

An alternative method to checking a floor system or wall system for square, other than 3-4-5 method and Diagonal Method

Squaring Method

Pythagorean Theorem

Leveling Method

Framing Method

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In residential construction, it is important that building lines be accurately established in relation to _____ lines.

Building

Lot

Property

Zoning

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Staking a building starts with locating the _____.

building lines

setback lines

property lines

lot lines

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Grade leveling is immediately useful to the _____, who must determine how much earth must be removed to dig a basement or trench a foundation footing.

surveyor

excavator

builder

architect

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?