Hot Water Systems PP2 Phase 3 Quiz

Hot Water Systems PP2 Phase 3 Quiz

Professional Development

10 Qs

quiz-placeholder

Similar activities

Ohm's Law

Ohm's Law

Professional Development

10 Qs

The Prodigious Place live in ~ Our Solar System

The Prodigious Place live in ~ Our Solar System

Professional Development

15 Qs

Football

Football

KG - Professional Development

15 Qs

HABA PENDAM TENTU / SPECIFIC LATENT HEAT

HABA PENDAM TENTU / SPECIFIC LATENT HEAT

Professional Development

10 Qs

Aerodynamics Quiz

Aerodynamics Quiz

Professional Development

10 Qs

sulfur cycle

sulfur cycle

1st Grade - Professional Development

9 Qs

Refraction, Reflection and Diffraction

Refraction, Reflection and Diffraction

University - Professional Development

13 Qs

Rad Bio Ch 2 and Ch 4 Review

Rad Bio Ch 2 and Ch 4 Review

Professional Development

11 Qs

Hot Water Systems PP2 Phase 3 Quiz

Hot Water Systems PP2 Phase 3 Quiz

Assessment

Quiz

Physics

Professional Development

Medium

Created by

Steve Watson

Used 2+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the recommended capacity of the hot water cylinder per person in a property?

60 litres

30 litres

80 litres

45 litres

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which material is commonly used for hot water pipework in domestic properties?

Steel

PVC

Polyethylene

Copper

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the maximum capacity of the cold water storage cistern per person in a property?

30 litres

45 litres

80 litres

60 litres

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the approximate expansion of water when heated between 10°C and 99°C?

8%

2%

4%

6%

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the D1 pipe in an unvented hot water cylinder system?

Connects the cylinder to the shower

Connects the tundish to the discharge point

Connects the safety valves to the tundish

Connects the cylinder to the sink

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the recommended feed pipe size for a shower according to BSEN806 Part 3?

22mm

28mm

18mm

15mm

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of an expansion vessel in an unvented hot water system?

To heat the water

To cool the water

To accommodate thermal expansion

To regulate water pressure

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?