Second fix (mouldings)

Second fix (mouldings)

12th Grade

8 Qs

quiz-placeholder

Similar activities

General Knowledge Quiz - QUIZ CAPITAL KE

General Knowledge Quiz - QUIZ CAPITAL KE

12th Grade

10 Qs

Genesis 13-15

Genesis 13-15

5th Grade - Professional Development

10 Qs

Bauhaus und Weimarer Republik

Bauhaus und Weimarer Republik

10th - 12th Grade

10 Qs

BUILDING MATERIAL

BUILDING MATERIAL

10th - 12th Grade

10 Qs

2022 STEAM Week Engineering Quiz

2022 STEAM Week Engineering Quiz

7th - 12th Grade

10 Qs

Drafting alphabet of lines

Drafting alphabet of lines

7th - 12th Grade

10 Qs

Architectural Sculpture (Greek Art)

Architectural Sculpture (Greek Art)

11th - 12th Grade

10 Qs

solar system-gravitational force

solar system-gravitational force

4th Grade - University

10 Qs

Second fix (mouldings)

Second fix (mouldings)

Assessment

Quiz

Architecture

12th Grade

Practice Problem

Hard

Created by

mark piller

Used 4+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

8 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The moulding fixed around a room at chair back height is called...

Skirting

Dado

Picture rail

Coving

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

The type of moulding profile shown in the image is...

Torus

Ogee

Chamfered and Rounded

Bull nosed

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

The type of moulding profile shown in the image is...

Chamfered and Rounded

Torus

Pencil Round

Ogee

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A carpenter is to fix a length of ash skirting to a solid wall. What fixing method should the carpenter use?

Nylon hammer fixings with the screw heads filled.

Wall plugs and screws with the screw heads filled.

Wall plugs and screws, counterbored with wood plugs.

Fast grab adhesive so no visible fixings are showing.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A carpenter is to set out for a dado rail which is to be fixed at a specific height along a corridor. At what reference point should the carpenter take the dado rail height from?

Ordnance Survey Bence Mark.

Temporary Bench Mark

Datum

Finished floor level

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A moulding fitted around the walls of a room at approximately the height of the door is called what?

Dado rail.

Picture rail.

Architrave

Cornice.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A square room is to be fitted with skirting. What joint would be used in the corners of the room?

External mitre

Internal mitre

External scribe

Internal scribe

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

The name of the moulding in the image is...

Astragal

Bullnose

Quadrant

Pencil Round