
Unit 7 Test
Authored by Umair Syed
Architecture
Professional Development
Used 2+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
34 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
5 mins • 1 pt
The development of a new office block would be classified as:
Residential construction
Infrastructure construction
Industrial construction
Commercial construction
2.
MULTIPLE CHOICE QUESTION
5 mins • 1 pt
In what location would a DPM be installed in a building?
Wall
Floor
Roof
Window
3.
MULTIPLE CHOICE QUESTION
5 mins • 1 pt
Which of the following is a potential disadvantage of using a steel frame system?
Strength to weight ratio
Installation time
Fire protection
Flexibility of design
4.
MULTIPLE CHOICE QUESTION
5 mins • 1 pt
Which of the following is not an element of the substructure?
Retaining walls
Lintels
Basements
Foundations
5.
MULTIPLE CHOICE QUESTION
5 mins • 1 pt
From the list below, which would not be a factor to be considered when selecting a foundation type?
Soil type
Ground conditions
Local wildlife
Location of drains and trees
6.
MULTIPLE CHOICE QUESTION
5 mins • 1 pt
Which type of foundation is shown in the image below?
Pad
Stepped
Raft
Pile
7.
MULTIPLE CHOICE QUESTION
5 mins • 1 pt
Which component of a cavity wall connects the inner and outer leaf?
Wall toggle
Wall tie
Wall connector
Mortar fixing
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?