Search Header Logo

CL-900i Service Training Quiz

Authored by Hiếu Nguyễn Trung

others

CL-900i Service Training Quiz
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

66 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

3. There is only one substrate bubble detection sensor

TRUE
FALSE

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

6. During the CL-900i installation, sample barcode and reagent barcode scanning position needn't to be aligned.

TRUE
FALSE

3.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

7. Which options are correct regarding incubation module ?

All positions on incubation module are covered in manipulator movement range.
Above parts can NOT be replaced separately, replace the whole incubation module if temperature control issue was found.
Incubate cuvettes by heating the aluminum incubation block.
Incubating positions are distributed in array of 12*7, beside incubating position, there are 2 fixed positions for optic measurement and waste liquid draining

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

9. How many reagent/sample positions does CL-900i have?

15/50
25/60
20/50
15/60

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

11. How many plltiers are used in the reagent refrigeration module?

1
2
3
4

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

12. All reagent refrigeration cold end and hot end fans have stop detection function.

TRUE
FALSE

7.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

13. Regarding substrate priming, which of the following options are correct?

The substrate priming should be executed under the same software interface of substrate tube cleaning.
After priming, the substrate probe should be installed back to dispersion carousel, the black connector should be tighten again, the plug of substrate waste draining tube should be installed back.
The substrate priming should be executed under interface of "Substrate priming".
After priming, the substrate probe should be installed back to dispersion carousel, the plug of substrate waste draining tube needn't to be installed back.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?