Search Header Logo

SQA MCQ

Authored by Rajesh Singh

Other

University

Used 1+ times

SQA MCQ
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is not included in failure costs?

rework

repair

failure mode analysis

none of the mentioned

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which requirements are the foundation from which quality is measured?

Hardware

Software

Programmers

None of the mentioned

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is not a SQA plan for a project?

evaluations to be performed

amount of technical work

audits and reviews to be performed

documents to be produced by the SQA group

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Degree to which design specifications are followed in manufacturing the product is called

Quality Control

Quality of conformance

Quality Assurance

None of the mentioned

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is not included in External failure costs?

testing

help line support

warranty work

complaint resolution

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is not an appraisal cost in SQA?

inter-process inspection

maintenance

quality planning

testing

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who identifies, documents, and verifies that corrections have been made to the software?

Project manager

Project team

SQA group

All of the mentioned

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?