24 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a project risk mitigation step that you might take as a test manager?

Testing for performance problems

Hiring a contractor after a key test analyst quits

Procuring extra test environments in case one fails during testing

Performing a project retrospective using test results: Risk identification

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

You are planning the testing for an integrated system that will use three off-the-shelf components to manage a bank's accounts-receivable system. You conduct an informal quality risk analysis session with stakeholders to determine what and how much test conditions should be tested. Which is a quality risk: sẽ liên quan đến product item that you might identify in the quality risk analysis session?

Failure of a component vendor to conduct adequate component testing: project risk

Calculation of excessive late-payment penalties for invoices: tính toán tiền phạt cho các hóa đơn

On-time payment of all invoices for international vendors: k phải risk

Calculation of risk priority using likelihood and impact: risk level

3.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

During a formalized quality risk analysis session following the Failure Mode and Effect Analysis technique, you are calculating risk priorities. Which of the following are major factors in this calculation?

Severity and priority

Functionality, reliability, usability, efficiency, maintainability, and portability

Loss of a key contributor on the test team

Loss of a key contributor on the development team

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Assume you are a test manager in charge of integration testing, system testing, and acceptance testing for a bank. You are working on a project to upgrade an existing automated teller machine system to allow customers to obtain cash advances from supported credit cards. The system should allow cash advances from $20 to $500, inclusively, for all supported credit cards. The supported credit cards are: American Express, Vissa, Japan Credit Bank, Euro card and Master Card. Which of the following statements best associates a key stakeholder with the kind of input that stakeholder can provide during a quality risk analysis?

A tester can provide input on the likelihood: xác suất of a risk item.: TTA

A developer can provide input on the impact of a risk item: likehood của risk

A business analyst can provide input on the likelihood of a risk item: BA thì biết đc impact nhưng k biết đc likehood

A help desk staffer can provide input on the impact of a risk item

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a situation in which you would expect an iterative quality risk analysis to result in the largest number of new or changed risk items and risk levels?

You perform a risk analysis on the final requirements specification and subsequently receive a draft design specification.

A tester leaves after test design is complete, and you hire a new tester to replace her.

The development manager hires two additional programmers after the quality risk analysis is complete.

You perform a risk analysis on the final requirements specification and then that document is placed under formal configuration management: baseline

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Assume you are a test manager working on a project to create a programable thermostat for home use to control central heating, ventilation, and air conditioning (HVAC) systems. In addition to the normal HVAC control functions, the thermostat also has the ability to download data to a browser- based application that runs on PCs for further analysis. During quality risk analysis, you identify compatibility problems between the browser-based application and the different PC configurations that can host that application as a quality risk item with a high level of likelihood. You plan to perform compatibility testing to address this risk. Which of the following is a way in which you might monitor the effect of testing on the reduction of this risk during test execution?

Reduce the number of supported PC configurations

Assign more testers to cover compatibility than testers to cover functionality

Analyze the number of defects found that relate to this risk item

Plan to test the most common PC configurations.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is an example of a project where failure mode and effect analysis would be a better choice for risk analysis?

It is the project team's first application of risk-based testing.

The system under test is both complex and safety critical.

The system under test is a financial system.

Minimizing the amount of documentation is a key concern.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?